Browse
Search
Agenda - 04-21-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 04-21-2009
>
Agenda - 04-21-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2009 10:27:48 AM
Creation date
4/20/2009 1:38:19 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
2009-020 Solid Waste - Coleman Gledhill Hargrave - Letter Agreement between Orange Co. and Womble Carlyle for special legal services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090421
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
An exception shall be allowed for golf courses where the <br />line of play crosses a stream buffer. Only trees which obstruct <br />the intended line of play may be cut, provided stumps and root (~ <br />mass are not removed and trees which are cut can be removed <br />in a sensitive manner which minimizes additional disturbance to <br />the stream buffer. <br />3) New vegetation shall be planted to capture non-source <br />pollutants before they reach the. perennial stream, as per <br />applicable Orange County Standards. <br />Amended <br />9/1s/o1 d) Calculating Width of Stream Buffer <br />Those streams identified by FEMA as having floodplains shall have <br />stream buffers calculated from the outside edges of the floodplain. <br />1) How to Calculate Slope <br />a. Draw 250' length perpendicular lines, at 200- foot horizontal <br />intervals along the entire length of the outside edges of the <br />stream, or the outer edge of .the FEMA floodplain, <br />whichever is greater. <br />b. Determine the elevation at either the stream bank itself (1) <br />or the outer edge of the FEMA floodplain, whichever is <br />highest, and at the point 250' from the stream or FEMA <br />floodplain, whichever is applicable, along the perpendicular <br />line (2). <br />c. Subtract (1) from (2). <br />d. Divide c. by 250. <br />e. Multiply d. by 100. <br />f. Perform this calculation for both sides of the stream or <br />floodplain. <br />Hereafter, the number derived in'e. will be referred to as "slope value." <br />2) Method A -Stream Buffer Based on Slope and Groundcover <br />The width of the buffer shall be a minimum of fifty (50) feet from <br />each edge of the floodplain. In addition to the fifty (50) foot <br />buffer, an additional 15 feet shall be added to the 50-foot buffer <br />(65 feet total) where the slope value is less than 7.5%, as <br />measured 250 feet from the edge of the floodplain. For slope <br />values 7.5% and greater, as measured 250 feet from the edge <br />of the floodplain, an additional 30 feet shall be added to the 50- <br />foot buffer (80 feet total). These calculations shall be made <br />from each side of either the stream bank or floodplain, <br />whichever is greater. <br />~_ <br />M:\Erosion Control Div\Stream Calls\Zoning Text.012005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.