Browse
Search
Agenda - 04-21-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 04-21-2009
>
Agenda - 04-21-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2009 10:27:48 AM
Creation date
4/20/2009 1:38:19 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
2009-020 Solid Waste - Coleman Gledhill Hargrave - Letter Agreement between Orange Co. and Womble Carlyle for special legal services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090421
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wastewater associated with this project will have no adverse effects on surface or <br />groundwater at the site as the facility will be designed so that the tipping floor area will <br />be totally enclosed. <br />As referenced in Section 3.10, a SWID survey ident~ed several features as subject to the <br />stream buffer section of the County's Zoning Ordinance. As such, construction of the <br />waste transfer station will adhere to these regulations. and the appropriate buffers <br />calculated and left undisturbed to protect these waters. Follow up with the USACOE <br />regarding the isolated pools located in the parcel will be completed prior to construction. <br />However, construction is not planned to impact the area referenced by the County Staff <br />as requiring USACOE input. <br />4.11 .Forest Resources <br />If the flora and fauna inventory conducted prior to site acquisition indicates any forest resources of <br />significance that maybe affected by this transfer station, the appropriate agencies will be contacted <br />for recommendations. <br />C <br />The construction of the transfer station will result in the loss of approximately 20 acres of trees, but <br />the majority of the site will remain wooded. The remaining wooded area is of the same habitat r <br />type as that to be cleared prior construction. Project design will include erosion management ~ <br />practices, and long-term effects from the removal of these trees are not expected. <br />4.12 Shellfish or Fish and Their Habitats <br />As stated above, if the survey identifies any significant shellfish or fish habitats in the vicinity of <br />the site, then the proper agencies will be contacted for guidance. However; there are no perennial <br />surface waters located in the project area, and the creeks located nearby are not expected to be <br />effected. Therefore, no impacts are expected for these three species of freshwater mussels and one <br />species of fish. <br />4.13 Wildlife and Natural Vegetation <br />If it is determined by the flora and fauna survey that the transfer station placement will <br />significantly affect the wildlife and natural vegetation of the site, the appropriate agencies will be <br />contacted prior to construction. for recommendations for mitigation. <br />Only a portion of the site will be cleared for the construction of the transfer station building, <br />parking spaces, access road, and equipment storage (approximately 20 acres of the approximate <br />149-acre site). The surrounding wooded area, which is the same habitat type, will remain intact. <br />1°<. <br />I~ <br />11 ,,ff Environmental Assessment <br />~' ~ 1'-h Site 056 <br />
The URL can be used to link to this page
Your browser does not support the video tag.