Orange County NC Website
<br />3. will the project involve a lead applicatioa system. for <br />' treatment of wastewater? No <br />If yes, describe <br />Has an application for a non-discharge permit been <br />submitted to the NC Department of Environmental <br />Management or Orange County Department of'Environmental <br />Health? <br />4. Is a. septic tank system proposed which has a design <br />capacity of more than 3000 gallons per day? No <br />If yes, describe <br />Has an application for a non-discharge permit been <br />submitted~f to the NC Department of Environmental <br />Management or Orange County Department of Environmental <br />Health? <br />5.' Does the activity involve sludge disposal? No <br />If yes, where is the source of the sludge? <br />Describe where and how the sludge is being disposed. <br />Has a NPDES permit from the NC Division of Environmental <br />Management been issued? <br />6o water Usage '. <br />a. Estimated no. of employees_~8 x 25 gpd = -400 gpd <br />Separate septic system and drainfield to treat this sanitary waste. <br />b. Estimated water use for climate control gpd <br />c . •Praces s water 500 -1.000 gpd <br />This is the estimated water for the wash down system. <br />$ consumed ~. <br />$ discharged to septic system <br />$ discharged to surface {including storm sewers) <br />(describe: ) <br />$ evaporated . <br />100 $ reclaimed/reused Recycling of this water to be evaluated during design phase. <br />$ other <br />100 $ <br />