Orange County NC Website
H, STATE PERPSTTS RE¢iJIRED <br />1. Does the project involve the mining of earth products? <br />No <br />If sa, how many cubic feet of material are expected to be <br />excavated? <br />Has an application far a~Mining Permit been submitted to <br />NCDRCD? <br />Please attach rnap indicating expected extent of proposed <br />activity. <br />a. Does the project involve generation or storage of <br />hazardous or toxic wastes, as identified by the <br />Environmental 'Protection Agency? (A listing of all <br />hazardous materials is available from the Planning <br />Departmen. t,)- _No ' <br />Describe the wastes to be generated. <br />How much material is expected to be generated per month? <br />Will any material be treated onsite? <br />Volume? <br />Will any material be stored onsite? ' <br />Volume? <br />Where will disposal of the material take place? <br />How will materials be transported to the disposal site? <br />What measures are proposed to protect water quality and <br />air quality in case of spills? <br />l~ <br />