Browse
Search
Agenda - 04-21-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 04-21-2009
>
Agenda - 04-21-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2009 10:27:48 AM
Creation date
4/20/2009 1:38:19 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
2009-020 Solid Waste - Coleman Gledhill Hargrave - Letter Agreement between Orange Co. and Womble Carlyle for special legal services
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2009
Minutes - 20090421
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03f26f2009 1d: 12 919?153060 NCDENR PAGE 06f1a <br />Page 2 <br />I3 March Z0~ <br />,gp-solid Waste'Trrnsfer Stat[an <br />Fro,}ectt*fo. 04-0228 <br />significantly affeot natural vetloa and wildlife at the site the applicant pions to contact the appr4priat~ <br />ggencies for mitigation rocommandatians, . <br />Although we will cone~er with ~ p~j we offar tke following recommendations tofarther <br />minimize impacts to aquatle and terrestrial wildlife resources. <br />~ Although US~xS Soil Survey and Natiotlal pVe~Clund Invenroory maps provide general int'ormadon <br />regarding stream and wetland resources, these are of~ not inclusive of all stseamS and wetlands <br />that are present. It is not clear,uhetlier n site specific suruey has been rrr~iduclQd ~ determine <br />presenr,.E of streams and wetlands within tlye project boundaries. Therci''ore, if one has not already <br />lpeen dace, a site specific sui'~cy of wetlands and streams within tho prr»ject boundaries should be <br />performed prior to site design and cgnstruction. If voredands andlor 6toCams ~ found, the project <br />should be coordinated with the U•S- AMY ~rPs °f Engineets and file ~'C' plvlsian of Wai~cr <br />Quality. Site dcsiga and eotts#Nation should avoid impacting these t~s©urces to the maximum <br />extern practicable, <br />~ Maintain s tnullmutn l Od-foot undisturbed, native, foisted buffor along perennial streams, and a <br />50-foal buyer along intermittent streams and wetlands. Mainta'ming undisturbed, forested litiffer9 <br />slang these areas will mmimiza impacts to aquatie slid tsrreslrlal wildlife resources, wats~ <br />qu$lily, and aquatic habitat both within and downstream of the project area. In addition, wide <br />riparian bn help maintain s"trcatYi bank stability and tract pollutants associated with <br />stormwater runoff <br />~~~ ~ Thank you for th+e oppgrtunity to comment on this projcck Tf ~@~cait be Qf fi,Irther assistance, ;sY.>~ <br />441.7dx5. <br />please contact oiir off ce at (334 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.