Orange County NC Website
22 <br />Sec. 6.32.8. Effect anon outstandine floodHlain development Hermits. <br />Nothing herein contained shall require an~hanee in the plans construction size or <br />designated use of any development or an~part thereof for which a floodplain development <br />permit has been granted by the Floodplain Administrator or his/her authorized agents <br />before the time of assage of this Ordinanceā€¢ provided however that when construction is <br />not beeun under such outstanding_permit within a period of six (6) months subse uent to <br />passage of this Ordinance or anv revision thereto construction or use shall be in <br />conformity with the provisions of this Ordinance. <br />Sec. 6.32.9 Enforcement <br />The provisions of the SFHA Overlay District shall be enforced in accordance with the <br />requirements contained within Section 23.5 of this Ordinance <br />PART VIII. That Article 8 Special. Uses be amended by creating a new Section 8.6.1 entitled <br />Additional standards for development of uses within Special Flood Hazard Area Overlay <br />District (SFHA) to read as follows: <br />Section 8.6.1 Additional Standards for Development of Uses. within Special Flood <br />Hazard Areas. <br />The Board of County Commissioners may issue a Class "A" Special Use Permit for solid <br />waste disposal facilities, hazardous waste management facilities salvage/junk yards and <br />chemical storage facilities that are located in SFHAs if all of the following conditions are <br />met: <br />a. The use serves a critical need in the Orange CountX <br />b. No feasible location exists for the use outside the SFHA. <br />c. The reference level of anv structure is elevated or flood proofed to at least the <br />re ug latory flood protection level. <br />d. The use complies with all other applicable federal state and local laws <br />e. Orange County has notified the Secretary of the North Carolina Department of <br />Crime Control and Public Safetv of its intention to grant a Special Use Permit at <br />least thirty (30) days before rg_anting the permit. <br />The Board is required to make affirmative findings of fact based on the testimony of the <br />~plicant(s) as to the project's compliance with these standards <br />PART IX. That Article 10 Parking be amended by creating a new 10.2 to read as follows: <br />Sec. 10.2 Prohibited within Special Flood Hazard Areas. <br />Any off-street parking and loading facilities are prohibited within a Special Flood Hazard <br />Area. <br />