Browse
Search
Agenda - 04-21-2009 - 4o
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 04-21-2009
>
Agenda - 04-21-2009 - 4o
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2009 4:24:13 PM
Creation date
4/17/2009 4:24:12 PM
Metadata
Fields
Template:
BOCC
Date
4/21/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
4o
Document Relationships
Minutes - 20090421
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Equipment Description <br />Quantity Equipment Description Unit Price Total Price <br /> Altronis AL175ULX 6 Amp Pon'er Supply 12/24 Volts 234.00 234.00 <br />1 Altronix PD8 Haight Fused Output Board 33.80 33.80 <br />1 AXIS 241Q 4 Chamiel Video Server 830.70 830.70 <br />1 Cisco 3760-8PC-8 8 Port POE Switch 1.227.20 1.227.20 <br />3 Enersys NP712 Back up Batteries 36.40 109.20 <br />5 GE 1078C Door Contacts 8.45 42.25 <br />I IBD 6120BGT000OL Smart Card Reader Sw-itch Plate Gray 171.60 ]71.60 <br />2 Lenel AX-26549 Axis 216PD 726.70 1,453.40 <br />1 Lenel CTX-6 Panel Enclosure 156.00 156.00 <br />1 I.enel LNL-1320 Reader Interface 500.50 500.50 <br />4 Lenel L.NL-SW-LNR-CH1 Network Recorder Camera License 195.00 780.00 <br />2 Pclco CM400 Comer Ntount 48.67 97.34 <br />1 Pclco MCS16-10 Power Supply Camera lOArnp 16 Out 160.21 16Q21 <br />2 Pelco SD418-PG-E I Spectra® IV Env Pnd Gray Clr DM 18X 2,125.24 4,250:48 <br />2 Pelco SWM-GY Camera Mount 43.60 87.20 <br />1 ProNct SJB-1320 F'.nclosure for LNL-1320 84.50 84.50 <br />1 iJSP HUB2A Panic Buttons 17.16 17.16 <br /> Consumable Materials & Cable 655.05 <br /> Total Equipment and Materials 10,890.59 <br /> Add 6.75% Sales Tax 735.11 <br /> Add Labor 4,297.95 <br /> Add Shipping 263.33 <br />Total Price Including Equipment, Labor, and Sales Tax 516,186.98 <br />Warranty <br />All products are covered for one year, parts and labor, from date of hand. over. An extended maintenance <br />program is available. This includes parts and labor on all products for the second yeat• after date of hand over. <br />Service Rates <br />Out of warranty call out is charged at $75.00 per hour and $95.00 per how• out of hours (regular business <br />hours are 8.00 atn to 5.00 ptn, Monday to Friday). Response tithe is same day if service call is requested <br />before 10.00 am or if the system is down due to failure. <br />Terms of Payment <br />Unless otherwise arranged, payment is due upon completion. Interest will be charged at a rate of 1.5% per <br />tnonth on accounts 30 days past due. <br />We trust that in submitting this budget proposal we have addressed all your requirements. Should you need <br />further clarification or additional information; please do not hesitate to contact us. <br />Sincerely, <br />Alan Jelley <br />ProNet Systems, Inc. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.