Browse
Search
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 12:57:27 PM
Creation date
4/17/2009 12:07:02 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
Document Relationships
Agenda - 12-03-2007-6d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-03-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Prepare final site plan <br />• Assist in the preparation of the project operation & Maintenance manual for the system <br />Coulter Jewell Thames estimated completion time needed for the drafting/design work and <br />submittal for final permit approval is four months, for permit approval is two months, and for <br />bidding and construction is six months. The County will require Coulter Jewell Thames to <br />provide bi-monthly updates regarding the status of this project in order to stay abreast of the <br />progress and to place the County in a position to provide assistance should the project be <br />delayed during the permitting process. <br />a <br />FINANCIAL IMPACT: The Board is asked to approve a change order for this work not to <br />exceed $74,500. Approximately $27,000 of that amount is attributable to work on the site plan <br />and the project Operation & Maintenance manual, both of which may be accommodated through <br />the County Engineer's office with assistance from the Environmental Health Division of the <br />Orange County Health Department. The consultant will provide an updated construction cost <br />as part of the work. Project funds from the County's 2004 Net Debt Reduction Bonds fund the <br />construction of the system. Although the work would be accomplished via a change order to the <br />Northern Park Project design contract with Coulter Jewell Thames, the design and construction <br />costs for the system would be charged to the septic system project account. <br />RECOMMENDATION(S): The Manager recommends that the Board approve a change order <br />for additional services in the amount not to exceed $74,500 for the Northern Park design project <br />to include the drafting/design of the new wastewater treatment system as outlined above; and <br />• authorize the Chair to sign on behalf of the Board. <br />• <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.