Browse
Search
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-096 Purchasing - Coulter Jewel Thames Amendment to Agreement for Design of Northern Human Services Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2012 12:57:27 PM
Creation date
4/17/2009 12:07:02 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
Document Relationships
Agenda - 12-03-2007-6d
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-03-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.09 Permit Application Fees, Site Plan Fees, Re-review Fees <br />6.10 Environmental assessments other than Wetlands Delineation <br />6.1.1 Wetlands/Stream Disturbance Permitting <br />6.12 Surveying <br />The Engineering Consultant will not be responsible for or have control or charge of construction means, <br />methods, techniques sequences or procedures or for safety precautions and programs in connection with the <br />work, and will not be responsible for the contractors failure to carry out the work in accordance with the <br />contract documents. The Engineering Consultant will not be responsible for or have control or charge over <br />the acts or omissions of the contractor, subcontractors or any other agents or employees or any other persons <br />performing any of the work. It will be the responsibility of the contractor to verify the depth and location of <br />all underground utilities prior to starting construction. Should any underground utility not be located as <br />shown on the drawings, the contractor will notify the Engineering Consultant immediately before starting any <br />construction for a resolution of the discrepancy. The Engineering Consultant will be saved harmless from <br />any damaged utility during construction with the cost for repairing any underground utility borne by the <br />contractor. <br />OWNER RESPONSIBILITIES: <br />The Owner will appoint a representative through which all communications with the Engineering Consultant <br />will take place. The Engineering Consultant will be allowed access to the site at all times. The Owner will <br />be responsible for payment of any and all permit and application fees. The Owner will keep the Engineering <br />Consultant apprised of all relevant information that could affect the work. The Owner will also be <br />responsible for any fees charged by utility locating services. The Owner shall also provide the Engineering <br />Consultant with a sealed professional survey of the sites. The Owner will be responsible for providing the <br />Engineering Consultant with flow requirements for both pump station sites. The Owner will be responsible <br />for designing all aspects of the sewer system not outlined to be designed by the Engineering Consultant. The <br />Owner will be responsible for permitting the sewer system through Orange County Environmental Health <br />and the State. The Owner will be responsible for all bidding, construction administration, and construction <br />observation. All design parameters will be provided by Orange County. <br />COMPENSATION: <br />Compensation for basic services as outlined in the above scope of work will be provided for the stipulated <br />sums listed below plus reimbursable expenses as listed in the attached schedule. Additional Services will be <br />performed as requested according to the hourly rate schedule. <br />1. Grinder Lift Station -------------------------------------------------- $ 15,000.00 <br />2. Effluent Lift Station ------------------------------------------------- $ 17,500.00 <br />3. Drafting Assistance ------------------------------ Hourly, estimate $ 15,000.00 <br />4. Site Plans ------------------------------------------ Hourly estimate $ 15,000.00 <br />5. Project Manual ----------------------------------- Hourly estimate $ 12,000.00 <br />To tal Estimated Cost ----_________________________________ $ 74,500.00 <br /> (Includes estimate for hourly services for Items 3, 4, and 5) <br />Standard Hourly Rates <br />Licensed Professional Engineer ................................................................................ $ 120.00/hour <br />Licensed Professional Landscape Architect ............................................................. $ 120.00/hour <br />Licensed Professional Consultant ............................................................................. $ 120.00/hour <br />Survey Field Crew .................................................................................................... $ 120.00/hour <br />Engineer-in-Training ................................................................................................ $ 85.00/hour <br />AutoCAD Technician ............................................................................................... $ 70.00/hour <br />Secretarial ................................................................................................................. $ 30.00/hour <br />
The URL can be used to link to this page
Your browser does not support the video tag.