Orange County NC Website
1.03 Design of yard piping to connect the new grinder lift station to the existing collection lines and <br />grease traps that allows for two existing septic tanks to be converted to grease traps. <br />l .04 Electrical design for power feed to new lift station and design of the lift station instrumentation <br />and control systems. No provisions will be made for emergency back-up power supply per <br />direction from Orange County. <br />2. Effluent Lift Station <br />2.01 Design of a new effluent lift station to be located on the east side of NC 86 to pump effluent <br />from the end of the treatment facility to the nitrification fields. The effluent lift station will be a <br />triplex station with each pump delivering to a separate field. The wet well will be a precast <br />concrete vault. <br />2.02 Design of force mains to the nitrification fields. <br />2.03 Design of splitter boxes at the head of each nitrification field. <br />2.04 Electrical design for power feed to new lift station and design of the lift station instrumentation <br />and control systems. No provisions will be made for back-up power supply per direction from <br />Orange County. <br />3. Drafting Assistance for Other Portions of Project <br />3.01 Provide drafting assistance to Orange County to support their design efforts for the remaining <br />portions of the Project. Drafting and assistance will be provided to Orange County as directed <br />by the Orange County Engineer. <br />4. Site Plans <br />4.01. Prepare site plan drawings and applications for improvements on the east and west sides of NC <br />86 for review and approval by the Orange County Planning Department as directed by the <br />Orange County Engineer. <br />4.02 Meet with the Orange County Planning Department as required for review and approval of the <br />site plans. <br />4.03 Make revisions as required to the site plan drawings. <br />5. Project Manual <br />5.01 Assist the Orange County Engineer with the preparation of a project manual by developeing <br />contract documents and assembling bid packages as directed. <br />6. Additional Services not included in Basic Scope of Services, which can be performed at the <br />direction of the Owner <br />6.01 Permitting of the septic system. All permitting will be done by the Owner. <br />6.02 Bidding phase services <br />6.03 Construction observation, as-built drawings, or construction administration. <br />6.04 Re-designs authorized by the Owner after plans have been accepted by the Owner. <br />6.05 Re-designs due to unknown or unanticipated field problems including, but not limited to <br />unsuitable soil and undiscovered utilities. <br />6.06 Laboratory testing of materials, borings, and specialized geological studies <br />6.07 Assistance in negotiating for land and easement rights. <br />6.08 Construction stake-out of any site features or details <br />