Browse
Search
S Solid Waste - Orange Co Landfill Engineering Service Agreement with Draper Aden Assoc.
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
S Solid Waste - Orange Co Landfill Engineering Service Agreement with Draper Aden Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 4:46:48 PM
Creation date
4/16/2009 3:59:15 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2007
Meeting Type
Regular Meeting
Document Type
Agreement
Agenda Item
4i
Document Relationships
2017-006-E SW - Draper Aden Associates, Inc. - Amendment #3 to contract for engineering services
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Agenda - 12-03-2007-4i
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2000's\2007\Agenda - 12-03-2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l~r <br />STATE OF NORTH CAROLINA ' i~ ~ <br />• THE COUNTY OF ORANGE <br />AGREEMENT FOR ENGINEERING SERVICES <br />This Agreement made and entered into this, day o 200~by and between <br />Orange County; North Carolina, on behalf of its Sohd Waste Department (herein referred to as <br />"County") and Draper Aden Associates, Inc., a Virginia Corporation licensed to do business <br />in North Cazolina (herein referred to as "Engineer"). <br />WHEREAS, the County wishes to contract with the Engineer for professional <br />engineering services related to ongoing groundwater monitoring and analysis on County <br />owned property and other engineering and hydrogeological services as directed in writing by <br />the County: and <br />WHEREAS, the Engineer wishes to provide these services; <br />NOW THEREFORE, it is mutually agreed as follows: <br />1. This contract shall be in effect from January 1, 2008 to December 31, 2010. <br />2. Duties of Engineer: The Engineer agrees to provide the following services (hereafter <br />• "work, services or tasks") at the Standard Billing Rates setforth on Attachment A: <br />a) An annual update of the landfill closure/postclosure costs; <br />b) A semiannual report Stunm~ri7ing the results of the groundwater analysis; <br />c) An annual update of remaining capacity of Subtitle D lined MSW landfill; <br />d) Assessment of corrective measures for landfill gas and groundwater; <br />e) Permit amendments/modifications; <br />f) And other engineering and hydrogeological services that the County may require. <br />3. Duties of County: The Engineer shall submit a written scope of work for tasks 2.d through <br />2.f. The Engineer shall submit estimated budgets for all Tasks for approval by the County <br />prior to commencing work under this agreement. <br />4. Subcontractors: The Engineer shall obtain County approval before using any <br />subcontractors or sub consultants <br />5. Billing and Payment: The Engineer shall submit regular invoices, using Standard Billing <br />Rates (Attachment A), for work performed and shall be paid for completion of the work <br />performed during that period under the terms of this Agreement. Payment shall be made <br />by the County within thirty (30) days of receipt of an accurate invoice. <br />6. Insurance: The Engineer shall procure and maintain insurance for protection from claims <br />under worker's compensation acts, claims for damages because of bodily injury including <br />personnel injury, siclaiess or disease or death of any and all employees or of any person <br />• other than such employees and from claims or damages because of injury to or destruction <br />
The URL can be used to link to this page
Your browser does not support the video tag.