Browse
Search
NS Contract - Brockwell & Associates Inc & Engineered Designs Inc Design Co Campus Bldgs
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Brockwell & Associates Inc & Engineered Designs Inc Design Co Campus Bldgs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 12:36:30 PM
Creation date
4/16/2009 9:12:19 AM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4k
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED 12/11/07 <br />Page 2- In Bold <br />ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting .Date: December 11, 2007 <br />1 <br />Action Agenda <br />Item No. ~ •-~ <br />SUBJECT: Contract Approval: Professional Services Contracts Associated with the <br />Design of County Campus Buildings <br />DEPARTMENT: Purchasing and Central Srvcs. PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): INFORMATION CONTACT: <br />Brockwell and Associates Agreement Pam Jones, (919) 245-2652 <br />EDI Agreement <br />PURPOSE: To consider approving contracts with Brockwell and Associates, Inc. and <br />Engineered Designs, Inc. (EDI) for work associated with the design of the office and library <br />buildings on the expanded County campus in downtown Hillsborough. <br />BACKGROUND: As the Board is aware, when using the Construction Manager at Risk <br />(CMAR) method of contracting for construction of a building, the General Statutes require that <br />the County have a direct contractual relationship with both the designers} and the firm providing <br />the CMAR services. The Board has previously approved the CMAR agreement with Telesis <br />Construction Company for the construction of the office building and library on the new county <br />campus. Action called for in this abstract will complete the contracting requirements for the <br />county campus by approving the contract with Brockwell Associates and EDI for the design of <br />the°facilities. As identified in the November 2, 2006 public hearing abstract, Brockwell <br />Associates, Inc. serves as the architect of the buildings and EDI provides the mechanical, <br />plumbing and electrical engineering design. Gardner & McDaniel, PA, who provide structural <br />engineering services, are subconsultants to Brockwell Associates, Inc. and that cost is included <br />in the Brockwell fees. <br />FINANCIAL IMPACT: The contractual amounts for design services of the office building and <br />library total $397,806, with $249,235 attributable to Brockwell Associates and $148,571 to EDI. <br />These expenses were considered in the overall cost of the project. The purchase amount paid <br />to the developer will be reduced by the combined total of the design contracts ($397,806). The <br />funds for the project are included in the Capital Investment Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.