Browse
Search
NS Contract - Strategic Growth Rural Conservation Consultant Implementation Update Amendment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2007
>
NS Contract - Strategic Growth Rural Conservation Consultant Implementation Update Amendment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2011 12:35:19 PM
Creation date
4/15/2009 4:57:00 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2007
Meeting Type
Regular Meeting
Document Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a5 -. <br />Attachment (B) <br />Proposed Stops of Services (with Supplement No. 2 dated 12.3.2007 shown ie red) <br />Orange County Transfer of Development Rights Implementation Plan (Phase III) <br />E. Prepare for TDR Implementation Plan Adoption <br />1. Working Group Meeting No. ~JPublic Meeting: TDR Program Review. The <br />Consultant will conduct one (1) public work sessions with the Working Group to <br />familiarize the public and property owners with the proposed TDR ordinance <br />language; staffing and implementation cost estimates; the proposed Evaluation <br />Measures; and to receive public feedback. The Client and Consultant will agree <br />to a format for this meeting in advance of its being scheduled. The Consultant <br />agrees to provide a minimum of three (3) staff to support and facilitate this <br />meeting for a period not to exceed 3.5 hours. The Client will distribute an agenda <br />prepared by the Consultant at least one week in advance of the Working Group <br />meeting and prepare summary menu es om is mee ing. <br />2. Two Elected/Appointed Official Presentations. The Consultant will present public <br />feedback findings at one (1) Planning Board meeting and one (1) meeting of the <br />Orange County Board of Commissioners. The Consultant will revise TDR Plan, <br />ordinance language, and implementation cost estimates as needed based on <br />direction from the County Commission. <br />3. Preparation of Project Report. The Consultant will prepare five draft and five final <br />copies plus one unbound original of a final Project Report. The Final Report will <br />contain a complete set of recommendations on Program Design, Administrative <br />Design, Ordinance Revisions, and Implementation Schedule. Appendices <br />available on CD-ROM in each of the final reports will include materials generated <br />from or received during the previous tasks. <br />Page 9 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.