Orange County NC Website
!~ <br />Exhibit C: Design Cost Credit due to County: Orange County Library para 2.03 <br />Engineering Contract Amounts <br />Brockweil ~ Associates Architecture Library <br />Development Plan 4,200 <br />Architecture 91,471 <br />Structural Engineer . .17,500 <br />EDi Engineering <br />Plumbing, Mechanical and Electrical Engineering 35,400 <br />Construction Administration Fee Adjustment 5,772 <br />Total of Contract Amounts <br />Less Contract Fees Paid by Telesis-Original' {27,460} <br />- Construction Admin2 (2,886) <br />Credit Sum due Orange County 123,997 <br />1 -The basic services fees for design of the Office Building and Library were <br />included in the original Purchase and Safe Agreement with Telesis Construction <br />Management. Since these fees are now the County's responsibility, the fees are <br />being credited in this Agreement to the County. The original fees of $397,806 were <br />approved by the BOCC on 12/11/07. This net figure represents the true credit since <br />Telesis had previously paid $74,215 of this $397,806. The number footnoted is the <br />library share of the amount paid by Telesis. <br />2 -The professional design fees that were originally represented in the Purchase and <br />Sale Agreement did not include design and engineering construction administration <br />fees. This amount represents a credit to the County for fifty percent of the total of <br />$15,600 of additional fees. Telesis Construction Management has agreed to pay the <br />other half. The number footnoted is the library share of the amount paid by Telesis. <br />