Orange County NC Website
/7 <br />Exhibit 8: Purchase and Sale Amendment Reconciliation: Library pars 2.01 <br />Library <br />Original Contract Purchase Price 6,662,957 <br />Sustainable 4 Pipe HVAC System' 164,861 <br />Generator, Structural Steel, and Site Revisionsz 253,942 <br />Contract Upfit Allowance Adjustment' {588,193) <br />Amended Purchase Price fi,493,567 <br />Footnotes <br />1 -This represents the sustainable designs approved by the BOCC on 1116108 <br />2 -These costs are approved alternates and changes to those alternates that arrived after bid. The changes <br />are the result of 1)post-design structural steel reinforcement for roof mounting of the generators instead of <br />generator placement in the alleyway between the two buildings, a change needed to accommodate senrice <br />vehicles in the alleyway; 2) the availability of more efftcient HVAC controls for more efficient and sustainable <br />operation of the library; and 3) mathematical reconciliation between the conventional design and the sustainable <br />design costs. These additional costs are reasonable for the work to be performed. <br />3 -Adjustments made due to the actual bid cost of tha building upfits related to the contractual allowances <br />described in paragraph 2.02 of the original Purchase and Sale Agreement. <br />