Orange County NC Website
// <br />Exhibit C: Design Cost Credit due to County: Orange County Office Bidg pars 2.03 <br />and Engineering <br />Brockwell 8~ Associates Architecture <br />Development Plan <br />Architecture <br />Structural Engineer <br />EDi Engineering <br />Plumbing, Mechanical and Electrical Engineering <br />Construction Administration Fee Adjustment <br />Total of Contract Amounts <br />Orange County <br />Office Bldg <br />4,200 <br />142,435 <br />35,000 <br />67,600 <br />9, 828 <br />259,063 <br />Less Contract Fees Paid by Telesis-Original' (46,755) <br />- Construction Admin2 (4,914) <br />Credit Sum due Orange County 207,394 <br />1 -The basic services fees for design of the Office Building and Library were included in <br />the original Purchase and Sale Agreement with Telesis Construction Management <br />Since these fees are now the County's responsibility, the fees are being credited in this <br />Agreement to the County. The original fees of $397,806 were approved by the BOCC <br />on 12h 1/07. This net figure represents the true credit since Telesis had previously paid <br />$74,215 of this $397,806. The number footnoted is the office building share of the <br />amount paid by Telesis. <br />2 -The professional design fees that were originally represented in the Purchase and <br />Sale Agreement did not include design and engineering construction administration . <br />fees. This amount represents a crediE to the County for fifty percent of the total of <br />$15,600 of additional fees. Telesis Construction Management has agreed to pay the <br />other half. The number foo#noted is the office building share of the amount paid by <br />Telesis. <br />