Browse
Search
Agenda - 04-07-2009 - 6a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 04-07-2009
>
Agenda - 04-07-2009 - 6a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 11:11:11 AM
Creation date
4/6/2009 4:29:40 PM
Metadata
Fields
Template:
BOCC
Date
4/7/2009
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6a
Document Relationships
Minutes - 20090407
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />Town and/or Community Participation — The construction of a permanent trail <br />(designed for transportation as much as leisure) connecting Lake Hogan Farms <br />to Morris Grove Elementary is a broader function than serving Twin Creeks Park <br />and educational campus, and more a pedestrian corridor serving a larger <br />northern. Carrboro community need. Should the Town participate in the cost and <br />construction of such a greenway? Should the Town maintain and operate the <br />trail? Additionally, there appears to be community sentiment toward volunteer <br />assistance in the trail construction, which could lower the project cost. <br />Possible Options for Linear Park <br />1.. Ask Town to Allow Approval and Construction of an Interim Trail (using <br />existing funds — Option 1)? <br />2. Pursue Permanent Greenway Project (perhaps with Town financial <br />. assistance requested - Option 2)? <br />A recommendation on the type of trail surface for both options will substantially <br />affect cost, and help inform discussionsInegotiations with the Town. <br />"No-Build" / Deferral Options <br />3. Construct Original Trail (Redline Trail) at a Future Date as Shown on <br />Master Plan (when full funding exists)? <br />-4. Defer Project to Phase I of the Park (when additional funds exist)? <br />
The URL can be used to link to this page
Your browser does not support the video tag.