Browse
Search
2008-002 Planning - Timeline Amendment Educational Facilities Impact Fees Technical Study
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008-002 Planning - Timeline Amendment Educational Facilities Impact Fees Technical Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2013 2:19:06 PM
Creation date
4/2/2009 4:07:57 PM
Metadata
Fields
Template:
BOCC
Date
1/15/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4u
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e c �• • • <br />THIS A EEMEM't, 0dw ed irgu this J day of Maly 2007, b and between 0Mnge <br />County. North Cwolipe, hwekatter calleil the -CmW, and TWhiert3iW Inc.. hereinafter <br />called 'the "Carrsullatht'. <br />WHEREAS the Coi city is In need of taertam services: and <br />WHEREAS the C,o wu Cant has expertise in skiderrt generation rates and impact fee <br />preparaft and analysis. <br />NOW, THEREFORE, W CONSIDERATION OF THE COVENANTS HEREIN CONTAINED, <br />and for Other good and valuable txnsiderati0e, the receipt and sufficiency of which is <br />hereby dw owiedped by each party to the other, a is hereby agreed as folk mw <br />1. The Cansufnt shall provide those services to the County as more particularly <br />iderdil ed in the aftched Exhibit "A". <br />2. In performing the swic es identified in the attedied Ext> W •A'. the consultant shall <br />perform as steps rmmssary to the full and effective perfamarwe of the tasks specifically <br />rdiw enced In Exh1: 4A'. <br />3. Consultant std provide sufficlent qualified pamonnel In perform all services as <br />mpired herein, including twt not limited to inspections and pueparmtion of reports. as <br />i sonably re�que ded by, epresentattvas of the County. <br />e. (A) The term of this agreement shall be from the date Of execution of the <br />Agreement and Corsudtant work pnduds shy date once base data as outlined In the <br />scope of work is presented by the County (including pass-through from the school districts) <br />to the consultant. Thereafter c6na tent work to produce a preaiminW draft report shall be <br />complete vM-dn 60 days sunless exbN%W by the County for an aMdomai 30 days. It shalt <br />gate upon the a cmpietbn to the satistacoon of the Couxity of Tasks 1-2 in SeclionA <br />and Tasks 1-9 ' in Seddon B specitlad in E*" -X. The public hearing referenced In <br />Section e. Talc 8 is Mpected to occur on Nonrember 19, 2WF and thereafter Consultant <br />shall complete, the Final Report within T days. <br />(B) NoNwithslooding the foregoing. this Agreement may be terminated by the <br />county upon ten (10) days written ndlc e, with or witlhout cause. g this Agreement is <br />tetmlriated, the Consultant shall be paid for services performed to the date of Consultant's <br />receiptof such termination notice. <br />RE <br />
The URL can be used to link to this page
Your browser does not support the video tag.