Browse
Search
2008 Abstract - Housing - Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing - Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 12:11:59 PM
Creation date
4/1/2009 1:52:32 PM
Metadata
Fields
Template:
BOCC
Date
11/6/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4n
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U <br />Name: Redell McClinton <br />Address: 521 Spruce St. <br />City: Hillsborough, N.C. 27278 <br />Phone: 643-3055 <br />Date: August 13, 2008 <br />DOORS: <br />2 <br />3. <br />Page 3 <br />Install anew %i moon glass, 36" metal 6-panel exterior door unit on the front. <br />Install keyed lockset and deadbolt to be keyed alike. Install matching <br />casing on the interior. Note: Door to open, close, latch and lock <br />properly. Prime new casing with an oil based primer. Apply 100% <br />silicone caulk under threshold to seal bottom of unit. Install <br />door properly level and plumb: Note: Raise door unit so bottom <br />of door swings- approx. 1 %a" off finish floor. <br />Install a 1 1/4" aluminum full view storm door on the front door. <br />Storm door to be complete with closure, lever lock and door sweep. <br />Storm door to open, close and latch properly. NOTE: Storm door <br />to be a Larson orpre-approved equal. <br />4. Install an aluminum over solid wood core triple track storm door on <br />the back door. Storm door to be complete with screen, closure, push <br />button lock and door sweep. Finish to be white. New door to open, <br />close and latch properly. <br />PLUMBING: <br />Install a 40 gallon electric water heater in the crawlspace. Make <br />all electrical and plumbing connections to the current code. <br />Price to include expansion tank, valves and all fittings. <br />Install a plastic level pad to set the water heater on. <br />2. Install a new single lever kitchen sink faucet with sprayer. Install <br />a Delta orpre-approved equal. Install new supply lines and new <br />cutoffs. Make all plumbing connections. <br />3. Reinstall the kitchen sink. Install new strainers, drain line assembly/ <br />p/trap. Make all drain line connections. _ <br />4. Install a new handicap commode, supply line and cutoff. <br />Install a new wax seal and commode bolts. <br />5. Install a new single lever tub/shower valve, shower head and trip lever. <br />Note: The shower valve to be a Delta orpre-approved equal. <br />Make all plumbing connections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.