Browse
Search
2008 Abstract - No Signature required Contract - Housing Rehabilitation Contract Award
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - No Signature required Contract - Housing Rehabilitation Contract Award
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:25:19 AM
Creation date
3/31/2009 11:17:38 AM
Metadata
Fields
Template:
BOCC
Date
9/2/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4f
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(~ <br />Name: Eleanor Matthews Page 7 <br />Address: 4502 Mill Creek Rd. <br />City: Cedar Grove, N.C. 27231 <br />Date: July 24, 2008 <br />HALLWAY BATHROOM: <br />2. Prepare the bathroom floor for vinyl. Remove commode. Install <br />~/s' Lauan plywood and a new vinyl floor. The vinyl to cost not <br />less than $18.00 sq. yard, Install painted shoe molding at all wall <br />and cabinet areas. Install a metal strip where vinyl meets the hardwood <br />floor. Re-install commode using a new wax seal. Caulk vinyl at tub <br />using 100% silicone caulk. <br />3. Install atub/shower wall surround above the walk-in tub. <br />The color to match tub finish. Caulk all edges and corners with <br />100%tub/shower silicone caulk. Note: The wall surround to extend <br />at least Eft from floor level and to cover existing hole from previous <br />shower head. - <br />MASTER BATHROOM: <br />1. Install a thirty inch vanity cabinet. Owner to choose fixush- <br />white or stained finish. Secure vanity to wall. <br />2. Install a five piece accessory kit. The kit to include two, twenty-four <br />inch towel bars, paper holder, tumbler holder and soap dish. <br />3. prepare the bathroom floor for vinyl. Remove commode. Install <br />%," Lauan plywood and a new vinyl floor. The vinyl to cost not <br />less than $18.00 sq. yard. Install painted shoe molding at all wall <br />and cabinet areas. Install a metal strip where vinyl meets the <br />hardwood floor. Re-install commode using a new wax seal. <br />REAR RIGHT BEDROOM: <br />1. Remove the bi-fold doors and hardware. Install a new 1 3/8" wood <br />closet door to match the bedroom door. Install door stop, hinges and <br />passage lockset. New door to open, close and lock properly. Stain <br />the door to match as close as possible to the bedroom door. <br />2. Repair the damaged wall in the right rear comer. Patch with sheet- <br />rock filler and tape. Apply and sand with three coats of filler. <br />sand smooth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.