Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1~am~ ElizaToTan <br />;Address: 2~~ W. ()range-St. .. <br />City; Hillsborough, N.~ ~7~'18 <br />Phone: 73~-853 . <br />Date: April 15 2~Q8' <br />ROOF & GUTTER <br />1; Remove the shingles and felt, paper to the sheathing: Prepare sheathing <br />for a nevi shiiigle.YOO£ Check roof sheathing; for. exposed:naiLti and loose° <br />decking,. Install 1 SIb felt paper, wh"t~'eve starter,, new vent boots ai#d <br />new chiinne~ flashing. Note: Reinoue the old heater vent frmiri the rear <br />section and Batch roof CJse a hand-held grinder to cut a groove I'or the <br />new chimney flashing: Install step and. counter flashing; Install 25 year <br />shingles. Note: White eve starter shalt be, install along all: eves <br />and gables. Carefully temuve the satellite dish. <br />~. Install a shingle°type ridgevent Remove a three ~3) inch section <br />fmm the ridge. Ridge vent ~ start approximately 18" from gables.: <br />3, Remove the alurnnunt fascia oti both side of the unit. Install '74' <br />of new matching aluminumn coil: stock vn tl1e fascia, Replace 12f# of`damaged <br />aluminum on the rear gable. Refer to Rehabilitation. specialist fox <br />location. Contractor to use proper roil-stock and -aluminum nails. <br />4. Install. a missing seetiQn:Ala soffit on the front porch overhang. <br />l~t~te.~glfifit material to match as close as possil~l <br />5. Install seamless aluminum gutters and downspouts an the umt. <br />Note: Gutters fa be properly installed. 'The downspouts located: <br />on the front: (facing W. tira~iige St.) shall terminate into solid Brainy <br />tile: Nate; The solid drain the shall be'irtstaIIed in: the same ditch <br />as the foundation drain tile. <br />EXTERIOR: <br />1. Pressure-v~+ash the eztenor of tfie unit. l+Tote;, The pressurre washing. <br />to be done after alI exterior work is. complete:: Contractor to use.-the <br />proper vin~+l sidutg gre-treat cleaner tc~ remove diet and mldepv, <br />~, Fili the cracked ma~rtar joints on the right rear foundation v4rall, <br />Contractor may use masoJiry caulk filler. Finish to match existing <br />wall. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.