Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />• P e' 10 <br />Name: Dorothy Baldwin <br />Address:17Q9 Rusch.Rd. <br />Cifl-: t~apel Hi:11; N C , 27515 <br />Phone: 96~ 2360. <br />Date: January 2, 2008 <br />BEI?3tOUM3 # 1, # ~ & # 3 <br />1, Remove the bed molding around the cuing. ~cate framing and <br />caulk lines across ceiling. Install %s" sheetrock using t '/,r"*2" <br />screws or sheetrock nails. Note: All. screws and nails to be driven <br />into solid framing. Finish shee'trock smoa#h and prime v~-th a <br />latex c~nshvcton primer,.. <br />2. Install three (3~ inch crown molding; in the bedrooms. <br />Note: All lengths less thou l6' shall be install in-:one section. <br />,A11 corners and. joints to fit properly. Prime new crown molding: <br />wit}% an oil based primer,- <br />3. Prepare the walls, ceiling and trim for paint. Fill. any holes and <br />damaged-:areas on the walls with sheefxock filler. Caulk: all seams <br />amd craei~ with latex caulk. Clean walls as necessary to provide <br />properbpnd,.Paint the walls and ceiling with flat latex paint. <br />Paint the trim and doors with semi-glass latex paint. AII, <br />paint shall cover completely. ItTote: Trim all doors to close <br />arillatchbefore painting. <br />F,I,Q©I~ SYSTEM REPAIR: <br />~. Install five ~~~ pressure treated floor joists under the living room <br />floor- Double the existing joists using matching sized lumber: <br />Nail the.new joist to the existing joist,. <br />~. Install two: (2) pressure ttea#ed dropped girders along the: ~t#re <br />span of the floor system. Center the. dropped girder ;/z span between <br />the.; front and:rear section. Install a triple 2x8 dropped girder. <br />Install adjustable metal post jacks 84" OC. The pest jacks <br />must rest on solid mascinry approved by the Oran$e Count3' <br />Inspection Dept:.. Level floor using :string lines and raise. floor <br />with post jacks. Do not raise .floor more :than ~/~"per day to <br />avoid cracking wall covering. _ <br />3. Install a galvanized metal termite shield on the exterior foundation <br />walls. In 12 fe+~# sections, j ack the floor system approximately 3/l ~'° <br />and slide the termite shield in from_the exterior. NOTE: Work to be <br />performed: before vinyl siding is installed`,: <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.