Orange County NC Website
`TT <br />Name: Doroth ` Baldwin Page 9 • <br />Y <br />Address: 1.09 Ruscl~ Rd.. <br />City; Chapel »l, N C;. 27516 <br />Phone; X67-2~ <br />Date:-January 2,, 2IXa8 <br />BA"THR~OM <br />Prepare the floor for ~-rryl. stall 3I8" BG plywood and n <br />neyr vinyl. floor.. The vinyl to cost not less #han ~ I4.Op sq. <br />yard. Install metal trim where: the vinyl meets the. hall <br />floor N©te: New pnderlayinent to l~ pt~~pesly insta~ied <br />and nailed. ` <br />6, Install never 4'~4'':mold~ed baseboard and shoe molding; Prime <br />the new molding with an oil based primer. <br />7. Prepare the walls; and ceiling f©r MR sheetcocl~. lJh~e: Install mold. <br />i~sisiant wall covering; in the tub/shower area Install'Jz' waIl heard <br />and fuish sinboth. Note: All shedrock.filler to be;properly finished <br />and sanded,. Appq a new coxtstructon primer to the walls <br />and ceiling: <br />8. Install a five piece :accessory icitt The lat to include two,,twenty--: . <br />four inch towel bars, soap dish,, tumbler holder and paper: <br />holder. Note; Install all .necessary fi axnu~g in wail to secure <br />hardware. <br />9. Install a surface moun# medicine cabinet above the sink <br />10 Prepare all surfaces for paint; Fill all nail holes and caulk all <br />n8cessary :seams:. in trim. Paint the walls, ceiling and trim with: <br />sent-gloss lat+e~c paint; X11 pant to suer compl+~tely; <br />11. move the door unit: in the bathr~m. Ite-frame opening to <br />receive a ,32" 6-panel 1. ~/8" interior door pro-hurig unit:. <br />Install a new 37 inch header and filler studs,' New door #o open; <br />elos~s and lack pmperlys Install a privacy°lockset and dac2r <br />bumper. Door to swing in alongright wall-a# kitchen <br />Priu~e all:bare. Wood with an oil primer.: . <br />12; Install twe ~2) 24" stainless steel l %4" grab bars in the tub/ <br />shower area. Install ail neeessjuy blocking to secure the <br />grab bars. Consul# homeowner for grab bar location. <br /> <br />