Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name` Dorothy Baldwin Page,g <br />Address: i'7U9 Rusch Rd. <br />pity: Chapel I3ilI, N ~:. X75.16 <br />Phone: 9~?-Z~fst? <br />Date: January 2, 2~Og <br />IfiITCHEI~T ! HALI[.VVAY <br />8. Prepare fibs kitchen. walls, ceiling aad;trim fir paint. dean the walls: <br />with a mild cleaner. Remove-all loose paint .Sand and feather all <br />rough edges. Prepare existing sheetrock walls with fiIler: Fi11 alb hales <br />with:latex; caulk:. Pri%tte the wails arid,"trim with a kilt type: primer.:: <br />Paint the ceiling'witix flat latex'paint, lsaint the walla and trim with: <br />semi-glass latex paint. All paint'shall covercomplotely. <br />LAVING ROOM: <br />1: Remove fine bed molding. Install %z" sheetrociC on the c,~ilirig. <br />Note: Before sheetrocle is installed located framing far proper nailing.. <br />F'uush. the. sheetrock srnaath. Prime ceiling with-anew sheetrock primer. <br />Prepare the.. walla and trim fQr paint. Feathdr sand all rough edges on trim <br />befiote primer is applied. Prime the wa11s acrd trim with a kilz :type oil <br />• primer. Paint the mails and ceiling with flat latex paint.. Paint fife trim, <br />and dears with semi-gloss latexpaint, All paint to cover carnpietely. <br />BATHItUOM' <br />1- Remove all: plumbing fixtures,; windgw, wall acid ceiling covering.: <br />to the flaming: <br />~,. Frame the wiindovsr :opeiang wtfi ~ai4 'framing. Install mafehiag <br />wail sheathing on the exterior, <br />3. Repair the damaged sub-floor around -the oammode #Iange and'. <br />tub ams. Remove approximately 1: slYeet ~ 32 sq #t) of damaged <br />sheathing.: Replace with matching pressure treated. plywood:: <br />Note: Install aIl.necessary blociang:around the ct~mmade flange <br />:and tub drain: <br />4 Add two (Z) pressure treated floor joists to :the bathroom. floor: <br />Install all necessary bhocking at walls and tub for sub ~laor nailing., <br />Properly nail thenew Hoar joists at center girder and outer band.. <br />NQTE; If further damage is discovered, the Qwner Gontraetor anrl. <br />Rehabilitation Specialist: will meet fo review the work, dcterinine <br />a course of. action and; if ne~sary, a cost far anY additionah <br />work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.