Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natie: l~oroth~r Baldwin Page <br />~~a. ~~i~ Busch R~,, <br />city: Chapel »u, rt.~. 27515 <br />Phone: = x35o <br />Date: January 2 21108 <br />KITCHEN / HAI~LW:i~Y <br />1: Repair the gagging ceiling tiles on the kitchen ceiling. Lase 1 ~1.~" <br />screws with one inch fender washers to screw tiles back to firing. <br />Remove bed molding in kitchen and hallway: Locate framing on entire <br />ceiling/ Using achalk-box pop lines across roozri for she~roc>s <br />installation. <br />2. Install y ' sheetrock on the kitchen and hall ceiling Finish sheetmck <br />smooth. Note:- Refer the :Rehabilitation Specifications for new <br />sheetrock installation, I.'rime'the ceiling with a new construction <br />primer: <br />3. Remove the base cabinets, counter fvp and wall cabinets in the <br />kitchen. <br />4. remove the top layer +~f vinyl flooring and sub-#loor in fil~~e kitchen. <br />Note: Rehalnlitation Specialist to inspect floor at kitchen. sink area. <br />If fuifiher damaged e~cists in this 1s~eation; the Cantracfor, Owner and' <br />Rehabilitation Specialistwilt;access damage, deterrniue a course 6f <br />action and change order for post of additional work. <br />5: ~ the floor for vinyl `Install 318-" BC plywood (finish grsdej <br />on floor -arid ~ new vinyl floor: Note: Pn~perly nail the new plywood, <br />Install plywood using nails ar staples appri~ved for flooring. <br />Install 'a neu vinyl floo. Tte vinyl' to cost nit less tlian' $14.00 sq yard . <br />Install metal trim at door and Kati opening, Install shoe molding at all <br />wall and cabinet amass, I~rime and palm the shoe molding with an oil. <br />based primer end pant- with semi-glass latex paint:. <br />6 Install new base cabinets, wails cabinets and rolled=back formica:. <br />counter-tops in the, kitchen Itef~er tt1 plan. Install approximately I~' <br />of basecabinet and 14' wall cabinet. Note: New.cabinets shall have <br />hardwood fronts and a factory finish: Nevv cabinets and counter--tops <br />t4 be installed property .Owner to choose finish white or oak: <br />finish, <br />7'. Install a 12" x 12" dropped soffit for all wall cabinets, Install <br />framing,; sheetrock and finish ;sheetroci~ smooth. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.