Orange County NC Website
• <br />3~ <br />DTairie. Dorothy Baldwin Page 2 <br />~dd~ss: r~c~ R,~hga: <br />qty ~hapel.I~ill, N.G: 2~fi1Cr <br />Phonies ~7-2~b(~ <br />.Date:: January Z, ZOOS <br />.EXTERIOR: <br />8. Install a new 3b nch,.vyhite aluminum stoan door. Storm door to he <br />full.. view:. Storms door to be .complete-with Iever handle, screen, closer <br />and vinyl sweep, Note: New storm door 1z~ open, Nose lock <br />properly.. New stem-doortabs afpremium qualit3c Install <br />Larsa'n argre-approved equal. <br /> <br />a~~» <br />i. Re-frame #e wiiiidow openings in all;bed~ooms to receive a <br />3~" x ~4" windo~e;. (Egress Code) Note: The " ` g headers <br />to remain.. Re-frame a fetal a~sa7t (6) window openings. <br />2 Install nevK donbie-hung vinyl c©nshuction windows with nailing <br />flange. Sates . 7- 32" x `54 ; 2- 3~"x..38", 2- ~(1" ~c 54" and one <br />picture windovi-,;48" x 5:~4". lris~li a t~tal.af elsyeu (11) ~+ndovYS and <br />gone (1~ picture wiriclaw: Install jamb extensions, new matcl~ing.casing, <br />window stool and,apmn. Prime, all new trim-with an oil based 1~' <br />Paint new trim with semi-glass latex paint. All paynt to co~+er <br />coaupletely. <br />3, Reinstall all existing vinyl shutters. <br />GUTTEi~S1DRt~INTILE. <br />1,. Install white 1lumn„r-; gutters an+cl' Q~er-siz+e~l. dc~wns~outs oni all <br />fascias including°the back parch, l~l'e~- gnttets to be seamless; <br />Install solid draintile to-all downspouts. The drain ails on the drive- <br />wa~± side shall teiYninate not less than 1(1 feet from the foundation. <br />NOTE; Contractor to consult with Rehabilitation Specialist about <br />lcscation of downspouts. <br />~. Install aluminum gutters guards on aU gut6ers. Note: Gutter guards <br />to be installed prs~periy. <br />• <br />