Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: .~rartrina Morrow Page ~ of <br />• address; l Q9 Starlite Drirrc <br />Carrbaro <br />:~~ Phone #: 36&038 <br />Date: SYl5fQ8 <br />~. l~LOOK +COi~E <br />l.. Remove existuig vinyl floor cover in Entry, entry closet, I~aundty close,, <br />Kitchen, Dining, Hall, two -lail closets :and three roans: of Bathroom to. <br />expc3se concrete floor slab.. ~temove baseboard.: and shoe- mold in E~'3!` <br />and right .side wall in Dining. Remove :shoe mold in sil three moms of <br />Batlrnom. Prepare existing slab and baseboard:-for .smooth uistallation of <br />nevv vinyl $oor cover: Supply and install ae~v painted 'wood baseboard.: <br />-where existing. was- removed including. replace missing baseboard in <br />I,atamdry closet. Supply and instalk new vinyl floor cover 'per Owner <br />selection, new painted shoe mold where exsting;was removed or missir-g <br />new stained shoe mold in Kitchen, and.- revsr metal transition strips, <br />coiupiete. New materials to match existing as clt~se as practical.. <br />$' <br />2; Remove existing; carpet anti. pad to expose concrete :floor siali in three <br />Bedrooms including Bedroom closets: Prepare existing slab and.. <br />baseboard. for smooth installation of new wail-to-wail pad and carpet: <br />Supply and ir-stall new pad and t;arrpet per t~wner ;selection at same. <br />locations; including inside Bedroom closets, complete. New materials to <br />match existing as close as practical. <br />• <br />Ivi GENERAL REPAIRS . <br />1. Supply .and. install new address numbers on'exterior of house near front: <br />door and visible fronn `the street; <br />$~. <br />2: Supply and install new 2X1 ~ wcivd framing #n create a "dam" in a#ic <br />ar©und attic stair opening m contain insulation. Repair disappearing. stairs <br />to close properly and re-se+~ure insulation. panel hn stairs. <br />N. SITE IMPR.4VEIVIENTS <br />1. Re-grade mil on -right- :side of house i© slope away fxom house <br />approximately $ .feet and to slope tovvand front of property. <br />Ii} INTERIOR ~Ql <br />A. KTTGfIEN . <br />1, Protect existing cabinets; co~tertops and `apPlanc~s from dust and debris:. <br />Reinnve trim from old- ceiling repair. .Prepare ceiling to accommodate <br />sheetrock overlay including adjust existing, electrical, ceiling lightffaA <br />fixture H'S~A~ regstier to new ;ceiling level Suppl~- and install. new <br />~" moisture resistant sheetrock and taping to blend: and match existing: <br />• and have smooth tr~sition tci existing walls.: Supply and install new <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.