Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A%e ?yt~izaa 1~Iorrc~v <br />#+,cldress; lQ9Starlite~Drwe <br />Cy ~arrborc~ <br />P#-one 9Gg-9098 <br />Date: S/1~/{)$ <br /> <br />~../ <br />Page 3 of S <br />r , <br />l~iote: 1'ribr to conducting I,~ad-Based Pint ~bat~ment a~- all per~onnet <br />associated. with the 'pt'fljec# should re+~ev~ and fullq understand the regnirementa of <br />ELI, applic~le loci, sate, and ~e~iernl regalatiuaa #hat may apply to the works; All <br />work is be~ done ie accordsace 'with the lead-based Paint Inspection/Risk Assessment <br />Report conducted by En~+irmiraental Testing 'Setwiees, Inc.-and dated Aprfl Z9, 2~$. <br />I. VVOIZI~SITE PI~PA.RATI4N <br />A. GROUT]D CDNTA~T <br />1. Before ext+~rloz coYlatruetion, construct a work site periu~eter curb of <br />2x~ timbers ten ~i 0) feet fivm the house exterior. Create an outer <br />._ <br />bamer of flags andlor plastu~ tape three (3) -feet on center and twentlr <br />t~b~ feet from the worl~site. Post proper signage in the' work area. All <br />warning signs must renu~ posted until clearance is°passe <br />2, During; the peria~ci of work on all exterior.. aomponen#s attach one layer <br />of 6-mi1 polyethylene to the building exterior' with forting strips,.. <br />extending the ~lOj feet past the work site. wrap, the plastic under the <br />perimeter ~c4's. Change the plastic dai'1y. <br />$. <br />B: PRE CLF1~T <br />1. Pre-clean the: urterior of. the unt..ncluding clean and HEP~4 ~vacuuut all: <br />horizwattal surfaces,. fa inciude< oli floors, w~dowaills, troughs,: <br />baseboards and casing. ~ <br />G. CLEARAN~>3 EXANIINATIC?N <br />~, After completion: of all work that disturbed LBP and any :other lead: <br />hazard reduction ac~vities, a qualified person shall perfi~rm a <br />clearance examination... Lead. remediaton work is not. consdeaed <br />ecimplete until a positive clearance result is achieved, <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.