Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />Name; Eliza°T'orain p~e'$ <br />Address 22:5: W. t~arige St <br />City:;Hills~oreuglt, I~I.C. 27278` <br />Phone. 732-8543. <br />T3ate: Apra 1:S, 24Q8 <br /> <br />4. Install two. i'~'~ stainless steel grab bars in the shower area. <br />I1ote Grab bars shall be screwed into framing atul lie secure. <br />Install stainless steel screws :Install one 36 inch grab bar and one:. <br />3{l inch grab bar: <br />5, Refinrne the door opening to receive a 32"'wide doox ~ 341:" <br />Install a 37 %'` header with j aclc studs.. Note: Price to include <br />sheehvck work oa Hallway aide: Install a 32" interior door unit. <br />The-door to swing agains# the back wall of the bathroorri. <br />Tlie new door to open, dose and lock properly. Install <br />a privacy lockset. Prime the: door unit v~ritli an ml based <br />primer-. . <br />6, Prepare the walls and celing:for 1VIlt sheetrock. Locate ,framing <br />in ceiling. Install mold resistant wall board in the tnblshower area., <br />Install 1V11t sheetir~ck Qn, the walls and ceiling. Finish the sheetrock " <br />smooth„ Nate: Nail Boles acid seams should nat be visible, Prirtie <br />ttie walls and ceiling with a new construction primer: <br />7: Prepare the floor far vinyl, Itastall. Y," lawn plywood and a ne3v <br />vinyl :flocn: The vinyl to cc~st'not less than $ 14,00' sq yard. <br />Install a metal strip at door seam, Apply acaulk-bead where the <br />vinyl meets the tub. Floor area- 5' ~ 5'.S" <br />8. Install wood molded baseboard and slue molding in bathroom, <br />Fill alt bails lades anc~ prime with an oil based primer: <br />9,; Install; a ftvepiece- accessory kit. Tlie lat to nclude'twc~ twenty- <br />four inch towel bars; soap dish,. tumbler holder and paper hfllder, <br />All hardwar+~ to be secure in wall.: <br />fl. Install a. recessed medicine cabinet above. the sink.. Finish to <br />mach vanity: <br />11. Install a 24 inch wall rSliinet beside the door and above the sink. <br />Refer to Rehabilitation Specialist fore location. Finish to be white. <br />Cabinet to have hardwood frcc~rit and factor3+ finish: <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.