Browse
Search
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2000's
>
2008
>
2008 Abstract - Housing- Housing Rehabilitation Contracts Awards
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2011 11:23:56 AM
Creation date
3/31/2009 9:50:08 AM
Metadata
Fields
Template:
BOCC
Date
8/19/2008
Meeting Type
Regular Meeting
Document Type
Contract
Agenda Item
4x
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- X13 <br />Pa~~ <br />Name Eliza Torain <br />.Address; Z25 qV. Grange St. <br />pity: I3illslzorough; N C. "2238 <br />Phone.- 732-ti543' <br />Date. April l:~`, 2008. <br />I~TCHEN / D~NING~ R04M & HAT,L <br />i .: Remove. all cabinets, sink and countertop in fhe kitchen. <br />2> Install new base: and wall cabinets; Ov~+ner to choose 1~nish- <br />(.white or ~oa1c firrish) The cabinets shall have hardwood finnts <br />and a factory finish, All'-hardware to be self-closing hinges-with <br />matching pulls or knobs, All exposed ages to be flush with factory <br />f nish. . <br />3. Install a rolled back formica counter top. Dote: Owner'to -choose <br />color/fixrisht: Wli#e„ almond etcj Note: 'V~a11 end of "countertop to <br />baclt splash installed. All edges to: be finished. <br />4: Prepare the floor for vinyl. Install3/8" BC plywood in the kitchen/" <br />dining morn floo#; Install'~~" lauan plywood: on the hall: floor.: <br />Note: AU plywood and vinyl to:be. properly installed. <br />~' The vinyl to cost not less than $1.00 sq, yard. Install new metal. <br />trim where~vinyl mee#s hardwood or carpet. -- <br />~. ~ Install nevyr wood shoe molding at all cabinet and wall areas. <br />Prime the shoe molding u~-i#h an oil based primer. ~~I1 all nail <br />"holes and prepare for paint. <br />BATHROOM: <br />1. Reznave the following items in the bathroom; Commode,; <br />sink, door urrit, ~rindvw and wall covering and file-m the framing <br />N(}TEt Do not "damage tab and wail mount sink. <br />2. Frame tho window opening wiih 2x~ franiin~ Install sheathing: <br />on the ercteror.. Fur opening to existing woad siding and install <br />fanfold insulation and vinyl sitting. Contractor to match <br />color as close.as possible. Note. ff new vinyl siding is not a close <br />match, The Ownex, Coltrac#or and Rehabilitation Specialist will <br />. <br />meet to~review the work, determine a course of action and,..f <br />necessar3r, a cost for any additional work, . <br />3, insta112z8 fraxniing for`: two (2j grab bars 1n shower areal: Consult <br />owner for location. <br />
The URL can be used to link to this page
Your browser does not support the video tag.