Orange County NC Website
• <br />• <br />• <br />i~ <br />Name: Eliza,Torain <br />Address: W. C?ran$e fit: <br />qty: Hillsborough; N.C, 27228 <br />Phone: 7~2=854 <br />'.Date: April;l5,, 20118. <br />Page s <br />I1~SIfLA,TIpN; <br />1. Install ~ 19 floor nsa.~tion in the cra~vispacel~Iote: All insulation <br />to .be properly instilled and inspected by (?tange County Inspection <br />Dep# <br />2~ Rernove all :debris: from the crawlspace and prepare crawlspace for <br />6=mil poly.. Level all high areas: of soil and fill in low sectflns against <br />lovt~er side wall. Install.6-roil poly in the crawlspace. <br />3 Install R=13 insulation in the elcterior ba#liroc~m wall. <br />MECHANICAL: <br />1. Install a new gas pack FIUAC syst+~n::Mechanical system'to be <br />sued in accordance with ASp[1tAE~Manual "T' specifications and: <br />dwctworl~ design to be in accorriancewith `IiRAFlManual."D" <br />specifications. Idew heaftau system shall be,a coxriplete operational <br />system. All.°worl~ to pass .current Mechanical Codes. Price to include <br />flcior registers, gas piping, thennastat ductwork and- permit.. <br />N©'TE: Mechanical. Contractor shall ~uxnish paperwork to <br />certify meeting tl~e above requirements. <br />Note'. Gas roam heater in living room to :remain in unit <br />2. Remove the vent :less ..gas wall beater ur the hallway, Remove all <br />gas piping in the :hallway. Cap. 0#1; gas lines''n crawlspace; <br />PLTJI~!IBING: <br />1. Install new PVC' drain lines to all fixtures. New drain lines to meet. <br />currenfiplumbingrode. Install all necessary cleanouts and gents per <br />code. A permit is required and work to be inspected by Zige <br />County It~peeton I'~epY. <br />~. I~rstall a Sewer cleanout within. 3 feet of the foundation wall. <br />Work to pass plumbing inspection. <br />3~ Insulate all supply lines'n the crawlspace with %Z''pipe insulation.: <br />Note: New pipe insulation to be installed properly: All corners to be- <br />cot on a ~Sa/o angle and #apecl. <br />