Browse
Search
Agenda - 05-11-1999 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 05-11-1999
>
Agenda - 05-11-1999 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 8:55:37 AM
Creation date
3/26/2009 4:39:47 PM
Metadata
Fields
Template:
BOCC
Date
5/11/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Public Works <br />Roof Asset Management Program <br />Remedial Work -1999 <br />D. Installation of a multiple ply and modified sor esen Systems membrane <br />system including all flashing access <br />those manufactured by Siplast, Soprema, TAMKO, and Firestone. <br />System to include manufacturer -20-year No Dollar Limit Warranty. <br />Consideration may be given to other systems such as single ply <br />depending on budget refinement. <br />E. Installation of new 24 gauge prefinished sheet metal flashing and <br />trim. <br />Subtotal $ 2,800 <br />Contingency — 5% $ 140 <br />Total Preliminary Construction Cost $ 2,940 <br />Sector 1 (4,200 sq. ft.), 2 (3,300 sq. ft.) and 3 (4,200 sq. ft.) <br />All sectors are shingles with maintenance required <br />Subtotal $ 1500 <br />Contingency — 5% $ 75 <br />Total Preliminary Construction Cost $ 1,575 <br />Total Cost —All Roof Sectors 7.455 <br />Jail <br />Sector 1 — Slate (2,900 sq. ft.) <br />A. Removal of existing slate including flashing and accessories down <br />to the deck. <br />B. Replacement of damaged or deteriorated wood decking. <br />C. Installation of new felt underlayment and reinstallation of slate. <br />D. Installation of new 16 oz. copper sheet metal flashing and trim. <br />Subtotal $137,750 <br />Contingency — 5% $ 6,900 <br />Total Preliminary Construction Cost $144,650 <br />)w <br />MINNEMWEV <br />
The URL can be used to link to this page
Your browser does not support the video tag.