Orange County NC Website
Orange County Public Works <br />Roof Asset Management Program <br />Remedial Work -1999 <br />D. Installation of a multiple ply and modified sor esen Systems membrane <br />system including all flashing access <br />those manufactured by Siplast, Soprema, TAMKO, and Firestone. <br />System to include manufacturer -20-year No Dollar Limit Warranty. <br />Consideration may be given to other systems such as single ply <br />depending on budget refinement. <br />E. Installation of new 24 gauge prefinished sheet metal flashing and <br />trim. <br />Subtotal $ 2,800 <br />Contingency — 5% $ 140 <br />Total Preliminary Construction Cost $ 2,940 <br />Sector 1 (4,200 sq. ft.), 2 (3,300 sq. ft.) and 3 (4,200 sq. ft.) <br />All sectors are shingles with maintenance required <br />Subtotal $ 1500 <br />Contingency — 5% $ 75 <br />Total Preliminary Construction Cost $ 1,575 <br />Total Cost —All Roof Sectors 7.455 <br />Jail <br />Sector 1 — Slate (2,900 sq. ft.) <br />A. Removal of existing slate including flashing and accessories down <br />to the deck. <br />B. Replacement of damaged or deteriorated wood decking. <br />C. Installation of new felt underlayment and reinstallation of slate. <br />D. Installation of new 16 oz. copper sheet metal flashing and trim. <br />Subtotal $137,750 <br />Contingency — 5% $ 6,900 <br />Total Preliminary Construction Cost $144,650 <br />)w <br />MINNEMWEV <br />