Browse
Search
Agenda - 05-11-1999 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 05-11-1999
>
Agenda - 05-11-1999 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 8:55:37 AM
Creation date
3/26/2009 4:39:47 PM
Metadata
Fields
Template:
BOCC
Date
5/11/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Engineering, Inc. <br />DO E Club Blvd., Durham, North Carolina 27704 -3404 <br />one: 91900 -7892 - Fax 919/220 -0729 <br />naitcbnrd@cdeng.com <br />om <br />)nsulting Engineers - Testing • Inspection Services - Analytical Laboratories <br />April 30, 1998 <br />Wilbert McAdoo <br />Director of Public Works, <br />Highway 86 North <br />Hillsborough, NC 27278 <br />Orange County <br />RE: Remedial Roofing Design <br />Richard Whitted Human Services Center (20,300 sq ft approximately) <br />Building 501 (900 sq ft approximately —1 area) <br />Building 503 -(1100 sq ft approximately — 2 areas) <br />Government Services Annex (500 sq ft approximately) <br />Animal Control (1,200 sq ft approximately) <br />Jail (12,300 sq ft approximately — 4 areas) <br />Northside Building 1 (1,300 sq ft approximately) <br />Hillsborough, NC <br />CTL Proposal No. 99- 070040 <br />Dear Mr. McAdoo: <br />WTI <br />EsteW WW 1927 <br />At your request we have prepared this proposal for providing selected services <br />for the referenced facilities. Generally, the services to be provided include <br />preparation of design documents for remedial roofing work. Also included is <br />contract administration during subsequent construction of the project. <br />Roof Engineering Services <br />Our services will consist of the following: <br />A. Design <br />1. Meet with you and your staff to define the area(s) of remedial work and <br />discuss the parameters of the project. <br />2. Preparing a preliminary design to include: <br />An outline of the scope of work and its extent <br />�1 <br />ncfl,.at- Ahin Indiana. North rarnlina. Pennsvlvania. Virginia. West Virginia <br />
The URL can be used to link to this page
Your browser does not support the video tag.