Orange County NC Website
Timetables/Progress Reports for Major OCS Capital Projects <br />3 -31 -99 <br />Cameron Park Renovation 1997 Bonds $270,000 <br />Completed <br />1. Dropped Ceilings <br />2. Replaced Light Fixtures <br />3. Upgraded HVAC <br />Central Elementary Media Center 1997 Bonds $ 90,000 <br />Will be completed in summer of 99 <br />1. Renovate present space adjacent to the media center for a computer lab & Video station as well as the <br />production and work areas of the media center. <br />2. Upgrade Carpeting and shelving displays <br />3. Add New Circulation area <br />C.W. Stanford Refurbishment 1997 Bonds $200,000 C1P Sales Tax $1,640,000 Total $1,840,000 <br />Project is scheduled for complete summer of 99 <br />1. Installed a gas fired hot water heating system <br />2. Modified the air condition system <br />3. Installed new ceiling tiles and ceiling insulation <br />4. Renovated bathrooms and modified for handicapped accessibility <br />5. New Furniture & Equipment <br />6. New Carpet and floor tiles <br />7. New Thermal windows <br />8. Restructured offices, media center and special education classrooms <br />9. Installed cooling system in gymnasium and dressing areas <br />10. Installed new soffits and gable ends <br />11. Added addition to the main gym and upgraded the football/soccer field area <br />12. Upgrade for handicapped accessibly <br />Efland Cheeks Gymnasium 1997 Bonds $85,000 CIP Sales Tax- $365,000 Total $450,000 <br />Project is scheduled for completion summer of 99 <br />1. Add Storage for indoor and outdoor physical education equipment <br />2. Add a small office for the physical education teacher and after school care <br />3. Complete renovation of the gym area to include air conditioning <br />Grady Brown Renovation 1997 Bonds $100,000 <br />Project scheduled for completion during summer 99 <br />1. Make campus handicapped accessible; add automatic door openers <br />2. Replace gym floor <br />3. Additional work for playground safety <br />Orange Hiah Renovation 1997 Bonds 1997 Bonds 150,000 CIP Sales Tax 383,000 Total $533,000 <br />1. Tennis courts and gym floors - completed <br />2. Design for field house and D Wing Basement - In progress <br />3. Filed House and D Wing and Science Laboratories - Scheduled to be complete in 1999 -2000 <br />4. Design for Auditorium - will be completed by 2000 -2001 <br />5. Auditorium Renovations - scheduled to be completed in.2001 -2002 <br />