Browse
Search
Agenda - 05-11-1999 - 3
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 05-11-1999
>
Agenda - 05-11-1999 - 3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 8:55:37 AM
Creation date
3/26/2009 4:39:47 PM
Metadata
Fields
Template:
BOCC
Date
5/11/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
3
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L9 <br />RECOMMENDED REPAIR METHODS <br />C' <br />BURA 6A Membrane Splits <br />Spud away gravel and flood coat. Remove all <br />layers of deteriorated membrane. Replace <br />wet insulation as necessary. Replace <br />membrane with four layers of fiberglass felt <br />or one ply modified bitumen base sheet and <br />one ply modified bitumen cap sheet. Repair <br />membrane to extend at least six inches onto <br />sound membrane. Replace surfacing with <br />similar materials or aluminized coating. <br />BURA 6B Membrane Slippage <br />Back -nail slipping membrane. Apply a <br />minimum of 3 plies of felt in asphalt, and <br />repair surfacing. <br />BURA 6C Deteriorated Metal <br />Remove and replace with new metal flashing. <br />Flashing <br />Apply a minimum of 3 plies of felt in asphalt, <br />and repair surfacing. <br />BURA 7A Open Field Seams <br />Cut seams and lay flat. Spud away gravel and <br />flood coat. Remove all layers of deteriorated <br />membrane. Replace wet insulation as <br />necessary. Replace membrane with four <br />layers of fiberglass felt or one ply modified <br />bitumen base sheet and one ply modified <br />bitumen cap sheet. Repair membrane to <br />extend at least six inches onto sound <br />membrane. Replace surfacing with similar <br />materials or aluminized coating. <br />BURA 7B Deteriorated Walkpads <br />Remove deteriorated walkpads where <br />possible. Install new walkpads in hot asphalt. <br />BURA 7C Loose Counter Flashing <br />Re- attach counter flashing with appropriate <br />- <br />fasteners. Do not used nylon sleeved <br />fasteners. <br />BURA 8A Blistering <br />For ruptured blisters only, cut blister and lay <br />flat. Spud away gravel and flood coat. <br />Remove all layers of deteriorated membrane. <br />Replace wet insulation as necessary. Replace <br />membrane with four layers of fiberglass felt <br />or one ply modified bitumen base sheet and <br />one ply modified bitumen cap sheet. Repair <br />membrane to extend at least six inches onto <br />sound membrane. Replace surfacing with <br />similar materials or aluminized coating. <br />BURA 8B Evidence of Ponding <br />Periodically monitor for evidence of <br />accelerated aging. Repair as needed. Install <br />new drains and tapered insulation when re- <br />roofing. <br />L9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.