Browse
Search
Agenda - 06-01-1999 - 8u
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-01-1999
>
Agenda - 06-01-1999 - 8u
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 8:59:33 AM
Creation date
3/25/2009 3:44:01 PM
Metadata
Fields
Template:
BOCC
Date
6/1/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8u
Document Relationships
Minutes - 19990601
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
RES-1999-036 Resolution of Approval of New Hope Rise Subdivision Preliminary Plan
(Linked From)
Path:
\Board of County Commissioners\Resolutions\1990-1999\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U,1.41TA*—,,� owr.i <br />STATE OF NORTH CAROLINA <br />DEPARTMENT OF TRANSPORTATION <br />JAmEs B. Hum JR.. <br />GOVERNOR <br />ORANGE COUNTY <br />Eddie Kirk <br />Orange County Planning Department <br />306F Revere Road <br />Hillsborough, NC 27278 <br />919 688 -7331 ext 2582 <br />DIVISION OF HIGHWAYS <br />15 April 1999 <br />SUBJECT: Preliminary Plan Review: New Hope Rise Subdivision off New Hope Church Road <br />south of Old NC 86 <br />Dear Mr. Kirk: <br />10 <br />E. Norris Tolson <br />SECRETARY <br />This office has completed its review of the subject's proposed preliminary plans for compliance with current <br />Department of Transportation minimum subdivision construction standards. Pursuant to any final plan approval, <br />this office respectful request you to make the owner /developer aware of the following requirements before starting <br />any construction. <br />1. Prior to any construction of any new access or alteration of any existing access within the right of way, the <br />developer /owner is required to secure a permit with this office. It is the responsibility of the owner /developer <br />to obtain a permit. <br />2. Prior to any construction, this office should receive, review and approve two (2) complete site layouts. The site <br />layouts will include horizontal and vertical alignment information, a typical section, drainage facilities, vicinity <br />map, and the number of lots with the proposed driveway location. <br />3. During the construction, it is the responsibility of the owner /developer to provide verification certifying that the <br />roadway surface, drainage, and seeding satisfies the approved design outside the State's right of way. <br />4. When working within the State's right of way, the owner /developer will contact the Graham District Office <br />before each of the following phases: (A) Drainage, (B) Grading, (C) Placement of base, (D) Paving, and (E) <br />Seeding. Failure to notify this office before each phase of construction may justify a verification certified and <br />signed by a professional engineer. <br />5. In accordance with the General Statute 136 - 102.2, new roads are not eligible for the State Maintenance system <br />unless certain requirements are met. An explanation of these requirements can be found on pages 13, 14, and <br />15 of the . Particular attention should be <br />placed on items 2 (petition for addition), 5, 6, and 7 (occupied housing requirement), 11, 12, and 13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.