Browse
Search
Agenda - 03-26-2009 - 4a7
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 03-26-2009
>
Agenda - 03-26-2009 - 4a7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2009 10:39:12 AM
Creation date
3/25/2009 10:39:01 AM
Metadata
Fields
Template:
BOCC
Date
3/26/2009
Meeting Type
Assembly of Government
Document Type
Agenda
Agenda Item
4a7
Document Relationships
Minutes - 20090326
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4a-71 <br />Orange Water and Sewer Authority <br />Jordan Lake Comments to NC Environmental Management Commission <br />July 10, 2007 <br />Page 3 of 5 <br />more than 1,500 acres of land acquired by OWASA in fee simple ownership or permanent <br />conservation easements, few, if any, additional management options exist for further reducing <br />nutrient inputs to these reservoirs. With no State or Federal regulatory mandate, we have <br />essentially established total maximum daily loads (TMDLs) for both lakes and implemented the <br />most appropriate nutrient management strategies; yet both lakes continue to exhibit periodically <br />high chlorophyll a concentrations and cyanobacteria episodes. Are these water bodies <br />"impaired?" We don't believe they are; but we do believe that North Carolina's nutrient criteria <br />and related water quality standards are in urgent need of substantial revision. DWQ's EPA- <br />approvedNutrient Criteria Implementation Plan deserves the Commission's full support. <br />Need for a Jordan Lake Use Attainability Analysis <br />What if the Nutrient Strategy and proposed Rules are adopted, but they don't work? <br />Proposed Rules .0265 and .0266 require all local governments in the Jordan Lake watershed to <br />develop stormwater management programs that will achieve and sustain reduced nutrient loads <br />from new and existing development. If the feasibility studies required under the Rules <br />determine that nutrient reduction targets for new and existing development are not attainable <br />due to technical, economic, or administrative constraints, then the Jordan Lake TMDL will not <br />be met and the strate y will be deemed a failure. Given the likelihood that this will be the <br />outcome of most, if not all, of the local feasibility studies, we urge the Commission and DWQ <br />to proceed immediately with a Jordan Lake Use Attainability Analysis, as authorized by the <br />Clean Water Act for situations where TMDLs cannot be achieved. In the meantime, we urge <br />the Commission to adopt a rational, realistic, and phased approach to implementing the nutrient <br />reduction requirements. <br />Point Source Nutrient Reduction <br />OWASA's Mason Farm Wastewater Treatment Plant has been meeting total phosphorus <br />removal requirements for nearly 20 years. In 2002 we decided to construct multi-million dollar <br />deep bed filters that could remove total nitrogen to the current limits of technology as part of our <br />next facility upgrade -even though OWASA was under no requirement to do so. Those <br />improvements have been completed, and our treatment plant can now remove total nitrogen to <br />the proposed target levels - at least until the plant reaches its new capacity of 14.5 million <br />gallons per day. Additional energy and chemicals needed to achieve the proposed 2016 mass <br />load limit for TN will cost more than $500,000 per year at our current wastewater flow rates, <br />and well over $1 million per year in today's dollars when the plant reaches full capacity in the <br />next 15 to 20 years. Without significant advances in TN removal technology, OWASA will not <br />be able to achieve the proposed annual mass load limit when average day wastewater flows <br />exceed 14.5 million gallons per day, and we may need to restrict additional connections to our <br />wastewater system at that time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.