Orange County NC Website
1999-00 CAPITAL BUDGET REQUEST SUMMARY <br /> SCHOOL/DEPARTMENT: Chapel Hill High School <br /> Please list requests in order of priority to.your school or department: Items should be over$500 each and not normally funded from a <br /> School's Furniture/Equipment budget.or CIP Computer budget. Do not include maintenance work order items. <br /> PRIORITY DESCRIPTION JUSTIFICATION COST/ <br /> • NUMBER SCHEDULE <br /> 1 Install ventilation units to interior rooms HEALTH AND SAFETY: These rooms are hot Under review <br /> in Building.A(124, 144, 158,244,248). and stuffy. Air quality is unsanitary and dangerous <br /> to the health of students and staff. <br /> 2 Construct a.walkway canopy HEALTH AND SAFETY: . Investigation required to <br /> connecting buildings A(main)and C Since CHHS is a.multi-building campus, during ensure proper ADA <br /> (Cult.Arts).-Extend and repair the inclement weather moving between classes in . compliance.measures,are <br /> canopy which connects buildings A and different buildings isoften unpleasant and 'developed. <br /> D(previously Vocational). sometimes presents a health and safety hazard, <br /> particularly to handicapped students. <br /> 3 Re-key all doors on the entire campus. Maintaining proper security at CHHS is an ever-.. CIP 99-00 <br /> present concern. Re-keying would make it. <br /> possible to significantly simplify the keying pattern <br /> by reducing the number of master keys and would <br /> render obsolete master keys that have been Jost <br /> during past years which have been found by <br /> unauthorized users. <br /> Refinish•the floor in the Dance Room in The floor has neither been replaced nor been Floor will be refinished over <br /> 4 :the Cultural Arts Building. reconditioned for many years. It is badly in need spring break 99(not replaced <br /> of replacement: <br /> Capital Budget Requests . <br /> Page 23 <br />