Browse
Search
Agenda - 06-08-1999
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-08-1999
>
Agenda - 06-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 12:05:17 PM
Creation date
3/24/2009 4:46:16 PM
Metadata
Fields
Template:
BOCC
Date
6/8/1999
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19990608
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1999•-00 CAPITAL BUDGET REQUEST SUMMARY <br /> SCHOOLIDEPARTMENT: McDouctle Middle School <br /> Please list requests in order of priority to your school or department. Items should be over.$500 each and.not normally funded from a <br /> School's Furniture/Equipment budget or_CIP Computer budget. Do not include,maintenance work order items. <br /> PRIORITY DESCRIPTION JUSTIFICATION COST/ <br /> NUMBER ` SCHEDULE <br /> 1 Move two basketball goals so that we Gym space is.at a real.premium. The initial facility Under review <br /> can have two full court games at the design called for an'auxiliary gym to be built;but this was <br /> same time. eliminated due to budget constraints.-There are times <br /> when we have as many as five classes at a time in the <br /> gym and.this would help alleviate the overcrowding. This <br /> change would allow two teams to practice at the same <br /> m <br /> tie. " " <br /> 2 Install a movable sound barrier in the McDougle does not have an auditorium and must rely on Acoustical Study <br /> cafetorium the cafetorium or the gym for times when we need to Requested <br /> assemble large numbers of students: The use of the <br /> cafetorium is"often impractical because of the amount of <br /> background noise"associated with the kitchen. The <br /> installation of effective sound barriers would make this <br /> space much more useful for'a variety of programs. <br /> 3 Repair/replace the sound system in We have a sound system in the gym and cafetorium . $1,000 Will be.completed <br /> the gyre and cafetorium which is hice when if works but is very unreliable. Since Summer 99 <br /> the acoustics in the cafetorium are so bad, it is imperative ' <br /> that we have good working sound system.'- <br /> Capital Budget Requests j <br /> Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.