Browse
Search
Agenda - 06-08-1999
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-08-1999
>
Agenda - 06-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 12:05:17 PM
Creation date
3/24/2009 4:46:16 PM
Metadata
Fields
Template:
BOCC
Date
6/8/1999
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19990608
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1999-00 CAPITAL BUDGET REQUEST SUMMARY <br /> SCHOOL/DEPARTMENT: Culbreth Middle School <br /> Please list requests in order.of priority to your school or•.department. Items should be over$500 each and not normally funded from a <br /> School's Furniture/Equipment budget or CIP Computer budget. Do not include maintenance work order items. <br /> PRIORITY COST/ <br /> NUMBER , DESCRIPTION JUSTIFICATION SCHEDULE <br /> 1 Rewire or install additional electrical We are unable to run all computers-and.other electrical Engineering study <br /> circuits to meet the demands of equipment simultaneously because of overloading circuits. underway <br /> -increased.technology and equipment. We are frequently cited by the fire marshal for violations <br /> due to the use of extension cords and overloaded circuits. <br /> -This problem is also reflected in the fact that our exterior <br /> lighting often does not-work properly'creating a very <br /> unsafe environment for evening.programs and activities. <br /> 2 Replace two existing glass=block walls Safety hazard due to jagged edges'and the possibility of $24,000 Summer 99 <br /> which have many broken and.crumbling caving-in on students and staff. This is also very (cellular rental) <br /> blocks. unattractive and detracts from the overall appearance of <br /> the facility.. <br /> 3 ' Renovation of several undersized'and There are three major areas of concern: The need for Requires investigation <br /> inefficient classrooms,:and or the three science tabs;the current facilities are grossly and major funding <br /> addition of several.modular units. undersized.and equipped. Our exceptional children's area <br /> has several classrooms created by:subdividing regular <br /> classroom space.' This area needs to be renovated to <br /> create acceptable space.:.Two of our classrooms can only. <br /> be accessed by going.through another teacher's class: : ' <br /> This prohibits office assistants from accomplishing their.. <br /> tasks and forces students to go outside and around the <br /> building to go to restroom facilities: <br /> Capital Budget Requests . <br /> Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.