Browse
Search
Agenda - 06-08-1999
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-08-1999
>
Agenda - 06-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 12:05:17 PM
Creation date
3/24/2009 4:46:16 PM
Metadata
Fields
Template:
BOCC
Date
6/8/1999
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19990608
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1999-00 CAPITAL BUDGET REQUESTSUMMARY <br /> SCHOOUDEPARTMENT: Ephesus Elementary <br /> Please list requests in order of priority to your school or department. Items should be over$500 each and not normally.funded.from a School's <br /> Furniture/Equipment budget or CIP Computer budget. Do not include maintenance work order items. <br /> PRIORITY COST/ <br /> NUMBER.` DESCRIPTION JUSTIFICATION SCHEDULE <br /> 1 Update cafeteria workspace for Currently the cafeteria has no system for heating or cooling. Engineering study is <br /> heating and cooling The cafeteria staff works in unreasonable conditions during the required <br /> summer and winter. <br /> 2 Flooring The linoleum/concrete floors in the gym,cafeteria,and atrium Gym for <br /> have caused several injuries.- Due to high use of these areas replacement is in <br /> for PE,dance,and other related activities these surfaces 99-00 <br /> should be resurfaced: e.i. Gym: hardwood. <br /> 3 Water.Fountains and ADA The water fountains in the.old wing need to'be replaced.The Access doors for <br /> Compliance Items Ephesus philosophy of inclusion should be represented in the gym in,99-00.CIP; <br /> physical plant: e.i. Power doors and curb accessible water fountain and <br /> sidewalks. sidewalks under <br /> review <br /> 4 Atrium Heating and Cooling Because the atrium is used for numerous activities a heating Space was not <br /> and cooling system would enhance its effectiveness. designed for <br /> heat/air-very costly <br /> 5 Kindergarten Playground The surface of the kindergarten'playground is showing,signs of Re-visit <br /> age with ripples in the paving. . <br /> 6 -Lights for Cabin Awnings Better illumination-is.needed from the main building to the five.. $2;500 Summer 99 <br /> cabins located in the rear of the school. <br /> -7 Hot Water in the Old Wing All the classrooms in the old wing that have running water only Major expenditure <br /> 'have-cold water not in current plan <br /> Capital Budget Requests <br /> Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.