Browse
Search
Agenda - 06-08-1999
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-08-1999
>
Agenda - 06-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 12:05:17 PM
Creation date
3/24/2009 4:46:16 PM
Metadata
Fields
Template:
BOCC
Date
6/8/1999
Meeting Type
Work Session
Document Type
Agenda
Document Relationships
Minutes - 19990608
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ile" CA) <br />CHAPEL HILL-CARRBORO CITY SCHOOLS <br />LOCAL RECURRING CAPITAL BUDGET <br />1999-00 <br />Category Justification Budget <br />Category / Projects: <br />Abatement Projects Indoor air and, materials testing, removal of vinyl 25,000 <br />tile and underlying mastic at Ephesus. <br />Site Development Install speed bumps at McDougle Elementary, 62,100 <br />fencing at McDougle Middle., repair sewer drain at <br />Carrboro, improve drainage and install a French <br />drain at Ephesus, correct erosion problems at <br />FP Graham Intermediate playground steps, and <br />replenish ground cover at all playgrounds. <br />Renovations Repair steps and sidewalk at Carrboro, install 181,300 <br />sidewalk on Estes campus, add lighting on Ephesus <br />campus, paint 15 classrooms at Carrboro, paint <br />entrance lobby and library offices at Ephesus, <br />replace counter tops at Estes Hills library, paint 5 <br />classrooms and bathrooms at Estes Hills, paint <br />cafeteria and kitchen at Glenwood, power wash the <br />Media Building at FP Graham, paint gymnasium and <br />stage area at S ' eawell, at Culbreth paint entry lobby <br />and 8 classrooms, add exterior lights at Phillips, <br />paint 8 classroom and gymnasium at Phillips, paint <br />8 bathrooms, 49 classroom doors, and 3 classrooms <br />at Chapel Hill High School. <br />Floor Covering Carpet and/or tile the following areas: 8 classrooms 40,000 <br />Replacement at Carrboro, lobby and administrative area at <br />Ephesus, 9 classrooms at Estes Hills, 4 classrooms <br />at Seawell, Culbreth's 160 POD, and 3 classrooms <br />at Chapel Hill High School. <br />Roof Replacement Phillips Middle School roof replacement project. 190,750 <br />'5114- / <br />
The URL can be used to link to this page
Your browser does not support the video tag.