Browse
Search
Agenda - 06-15-1999 - III
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-15-1999
>
Agenda - 06-15-1999 - III
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 9:17:19 AM
Creation date
3/24/2009 3:59:51 PM
Metadata
Fields
Template:
BOCC
Date
6/15/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
III
Document Relationships
Minutes - 19990615
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilbert McAdoo <br />Remedial Roof D&sign <br />5 Facilities <br />April 30, 1999 <br />Page 2 <br />An outline of the proposed roof system including vapor retarder, <br />insulation, membrane, and projection and perimeter flashings <br />Identification of items which may require special coordination <br />during construction e.g. site access, staging areas, interior access, <br />and use of special equipment such as an overhead crane <br />Preparing a preliminary construction cost estimate <br />Preparing an estimated project schedule <br />Meeting with you to review the preliminary design <br />i 0131 <br />J <br />0 <br />I <br />3. Preparing a final design to include: <br />• Preparing . plans, details, technical specifications, general <br />.conditions, and bidding documents. <br />• Field checking the design � <br />Updating the construction cost estimate and schedule <br />• Meeting with you to review the final design. <br />• Providing one set of originals and six sets of documents for your <br />use <br />Contract Administration <br />1. Prequalifying contractors prior to .advertising for bids <br />2. Scheduling and conducting a Prebid Conference <br />3. Preparing and distributing minutes of the Prebid Conference <br />4. Preparing any required addenda to the plans and specifications <br />5. Addressing contractor and owner questions during the bid period <br />6. Reviewing the bids and making appropriate recommendations <br />7. Preparing contracts . between the owner and the contractor for <br />performance of the required work <br />8. Reviewing contractor submittals <br />9. Conducting a Preconstruction Conference <br />10. Preparing and distributing minutes of the Preconstruction Conference. <br />11. Performing periodic site visits to assure compliance with the <br />specifications and quality of the work. A minimum of one visit per <br />week during the work will- be performed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.