Browse
Search
Agenda - 06-15-1999 - III
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-15-1999
>
Agenda - 06-15-1999 - III
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 9:17:19 AM
Creation date
3/24/2009 3:59:51 PM
Metadata
Fields
Template:
BOCC
Date
6/15/1999
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
III
Document Relationships
Minutes - 19990615
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Roof Building Conditions <br />The following information was provided to the Board as part of the May 11CIP work session agenda <br />materials. No action was taken that evening due to time constraints. <br />The Board on March 4, 1998 approved a contract with CTL Engineering to perform a condition survey of <br />the roof of each County owned facility, and development of a Roof Assessment Management program, at a <br />total cost of $16,900.00. The scope of work included: <br />• Conducting a roof condition survey for each County owned facility; <br />• Establishment of a prioritized maintenance and replacement schedule; <br />• Development of an annual roof replacement /repair budget from 1999 through 2004; and <br />• Development and implementation of a Roof Asset Management Program (RAMP) computer database <br />for managing, tracking, and projecting ongoing needs and associated costs. <br />The contractor provided initial delivery of the project results in fall 1998. Necessary refinements to those <br />documents, as requested by County staff, were delayed for several months during the prolonged illness of <br />the Public Works Director. All work has now been completed, all reports and the RAMP software have <br />been delivered by CTL to Orange County Public Works. A "full site book for the Whitted Human <br />Services Center is provided to the Board as an example of the detailed assessment that CTL has provided <br />to County staff for each County -owned building. The RAMP report outlines the needed roof repairs and <br />replacement by year with associated cost. The Public Works Department Staff has begun addressing these <br />needs as outlined below: <br />• Approximately 4,000 sq. ft. of the Animal Shelter roof was recently replaced, <br />• The old house at the Southern Human Services Center was recently re- roofed; <br />• The roof at Northside Building Two is scheduled to be repaired during May 1999. <br />Public Works staff will continue to schedule and complete roof repairs as identified in the CTL <br />Engineering Roofing Report. <br />County staff solicited and received a proposal from CTL Engineering for roof engineering services. A <br />summary of the proposed scope of work is provided as an attachment. The scope of work to be completed <br />by CTL Engineering includes remedial roof design work for: <br />• Animal Control (approximately 1,200 sq. ft); <br />• Government Services Annex (approximately 432 sq. ft.); <br />• Jail (approximately 18,200 sq. ft.); <br />• Northside Building One (approximately 1,300 sq. ft.); <br />• Richard E. Whitted Human Services Center (approximately 20,300 sq. ft.); <br />• 501 West Franklin Street (approximately 900 sq. ft.); <br />• 503 West Franklin Street (approximately 1100 sq. ft.). <br />The capital investment plan has $473,000 in approved 1998 -1999 funding and a request for $110,000 in <br />1999 —2000, for roofing consulting services roof replacement and roof repair. Staff requests that the <br />Board approve the proposal from CTL to undertake the remedial roof design work for the projects listed <br />at a cost of $37,000. <br />The Manager recommends that the Board: approve the recommended roof repairs /replacement schedule; <br />approve the CTL Engineering proposal submitted April 30, 1998; and authorize the Purchasing Director <br />to execute incidental paper work necessary to complete this process. <br />Lo"!i <br />
The URL can be used to link to this page
Your browser does not support the video tag.