Browse
Search
Agenda - 02-12-2009 - Attachment 5
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2009
>
Agenda - 02-12-2009
>
Agenda - 02-12-2009 - Attachment 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2016 3:59:01 PM
Creation date
3/19/2009 2:26:12 PM
Metadata
Fields
Template:
BOCC
Date
2/12/2009
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
Attachment 5
Document Relationships
Minutes - 20090212
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2009
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ . 5 <br /> CHAPEL HILL-CARRBORO CITY SCHOOLS <br /> Potential Capital Projects for Economic Stimulus Funding <br /> Amount Facility Project Description <br /> 31,980,730 Elementary Schoo #11 The Schoo District needs another elementary schoo <br /> 27,738.770 Carrboro High School Expansion of Carrboro High Schoo <br /> 2,500,000 Rashkis Elementary Schoo 6 Classroom addition <br /> 2,500,000 Morris Grove Elementary School 6 Classroom addition <br /> 200,000 Phillips MS/FPGraham Elm Removal of asbestos fascia material <br /> 420,000 CHHS/Phillips Removal of asbestos floor tile <br /> 358,000 CHHS Athletic field lighting and correct erosion problems <br /> 225,000 G|envvood/McOou Security systems: access control video cameras <br /> Culbreth/Phillips <br /> 370.000 Elementary Schools Removal of classroom carpet and install vinyl tile <br /> 1,035,000 FP Graham/Ephesus/Seawell/ Light fixture replacements <br /> Culbreth/Phillips <br /> 475,000 Glenwood/FP Graham/Culbreth Kitchen air conditioning and heating systems <br /> 265,000 Scroggs Chiller installation <br /> 650,000 Lincoln Center Replacement of building heating and cooling systems <br /> 375,000 Culbreth Duct work replacement and controls <br /> 448,000 CHHS D Building heating system <br /> 350,000 McDougle Mdl/Elm/Glenwood Controls for heating and cooling system <br /> 275,000 Seawell Replacement of Lawlor Building's roof <br /> 690,000 Lincoln Center Replacement of roof <br /> 3,854,840 McDougle Elementary and Middle Replacement of roofs <br /> 1,258,000 LinCtr/Seawell/Culbreth/Phillips/ Window replacements <br /> CHHS <br /> 233,000 FP Graham/Estes Hills/Phillips! Bathroom upgrades <br /> CHHS <br /> 739,000 Carrboro Elm/Estes/FP Graham Classroom casework <br /> Seawell/Phillips/CHHS <br /> 76,922,340 Total <br />
The URL can be used to link to this page
Your browser does not support the video tag.