Browse
Search
Agenda - 06-21-1999 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-21-1999
>
Agenda - 06-21-1999 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:35:04 PM
Creation date
3/18/2009 2:35:02 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />6 <br />r <br />FRONT BEDROOM: <br />1. Remove the wallpaper from the walls. Prepare all surfaces <br />for paint. Paint the ceiling with ceiling white latex and the walls <br />with flat latex and the trim with semigloss latex paint. <br />2. Install carpet and pad. Carpet allowance to be $14/yd. <br />3. Install a keyed lockset for bedroom door. <br />REAR BEDROOM: <br />1 Install a privacy lockset. <br />2. Paint the ceiling with ceiling white latex and the walls with <br />flat latex and the trim with semigloss latex. <br />3. Install carpet and pad. Carpet allowance to be $14/yd. <br />BATH: <br />1. Remove the existing tub enclosure. Install a tub enclosure <br />with corner shelves. <br />2. Install a handicapp commode. Install a supply line and <br />cutoff. <br />3. Paint the ceiling and painted walls with semigloss latex paint. <br />PLUMBING: <br />1. Install a double bowl, aluminum seven inch sink, p-trap <br />assembly, supply lines and cutoffs. <br />2. Install washerless faucets on the kitchen sink, the vanity <br />and tub. ' <br />3. Install a 3/a inch pipe on the pressure relief valve. <br />4. Roto root the bath drain line. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.