Browse
Search
Agenda - 06-21-1999 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-21-1999
>
Agenda - 06-21-1999 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:35:04 PM
Creation date
3/18/2009 2:35:02 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> <br />LIVING ROOM: <br />1. Remove the existing door unit and storm door. Install a six panel, <br />metal insulated door unit. Install lockset and deadbolt to be keyed the same. <br />Install a peephole and matching trim. <br />2. Install an aluminum clad storm door with pneaumatic closure <br />and vinyl sweep. <br />3. Repair the floor at the front door. Replace approx. 41.f <br />of sill. <br />4. Repair approx. 41f. of band. <br />5. Repair the floor and subfloor with likesize plwood. <br />6. Install carpet and pad. Carpet allowance to be $14/yd. <br />7. Paint the ceiling with ceiling white and the trim with <br />semigloss latex paint. <br />8. Remove the old furnace. <br />KITCHEN: <br />1. Install a deadbolt and lockset to be keyed the same. Install <br />a peephole. <br />2. Remove the existing cabinets. Install factory finish cabinets <br />with wood fronts. Insta1142" wall cabinets over the sink. Install same <br />lineal footage as the existing cabinets. Install a rolled backsplash, <br />formica counter top. <br />3. Install 1/a inch Juan plywood. Prepaze the plywood for <br />-vinyl. Install roll vinyl floor covering, metal trim and shoemold. <br />Vinyl allowance to be $14/ yard. <br />4. Paint the ceiling with ceiling white latex paint. Paint the <br />painted walls and trim with semigloss latex paint. <br />5 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.