Orange County NC Website
<br />15 <br /> <br />2. Remove the exisitng floor covering to the subfloor. Insta115/8 <br />inch CD plywood. <br />3. Install colonial style baseboazd. <br />4. Install a five piece accessory kit to include to towel bazs, <br />tumbler holder, soap dish and paper holder. <br />5. Install a transfer seat. <br />6. Remove the existing door unit. Install a 36 inch cased <br />opening. <br />RIGHT/MIDDLE BEDROOM: <br />1. Remove the existing ceiling tile. Install 12x 12 ceiling <br />tile. Install 13/4 inch bed mold. <br />2. Frame in the cased opening to the hall. Install matching <br />Sheetrock. Tape and finish the sheetrock smooth. <br />PLUMBING: <br />1. Install a seven inch, double bowl, aluminum sink with p-trap <br />assembly, supply lines and cutoffs. <br />2. Install a handicapp commode, supply line and cutoff in the <br />front bath and regular commode, supply line and cutoff in the rear <br />bath. <br />3. Install new washerless faucets on the kitchen sink, <br />vanity, and tubs. <br />4. Install a washing machine box in the wall in the kitchen. <br />4. Install a 19 inch vanity in reaz bath. Reinstall the pedestal <br />sink in the front bath. <br />3. Insta113/a inch pipe to the pressure relief valve on the hot <br />water heater. <br />