Browse
Search
Agenda - 06-21-1999 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-21-1999
>
Agenda - 06-21-1999 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:35:04 PM
Creation date
3/18/2009 2:35:02 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;i <br />14 <br />1 I <br />5. Install a surface mount medicine cabinet. <br />6. Install colonial style base board. <br />ADDITION BEDROOMS: <br />MIDDLE BEDROOM: <br />1. Remove the ceiling texture. <br />2. Retape the ceiling sheetrock. Prepare the ceiling for paint. <br />3. Remove the existing door trim. Fur door jamb as necessary <br />to be flush with the existing sheetrock. Install matching casing. <br />REAR BEDROOM: <br />1. Remove the floor covering to the floor joists. Install'/z inch <br />CD plywood and 5/8 CD inch plywood. <br />2. Install colonial style baseboard. <br />3. Remove the ceiling texture. Retape the ceiling. Prepare the <br />ceiling for paint. <br />4. Install a six panel, wood door and privacy lockset. <br />FRONT HALLWAY TO BATH: <br />1. Reframe the door fora 3-0 door unit. Install a 3-0 door <br />Unit and privacy lockset. <br />2. Install a 36 inch grab bar on the left hand wall. Anchor <br />securely. <br />FRONT BATH: <br />1. Remove the ceiling tile. Install lh inch sheetrock on the <br />ceiling. Tape and finish the sheetrock smooth. <br />
The URL can be used to link to this page
Your browser does not support the video tag.