Browse
Search
Agenda - 06-21-1999 - 8i
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1999
>
Agenda - 06-21-1999
>
Agenda - 06-21-1999 - 8i
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2009 2:35:04 PM
Creation date
3/18/2009 2:35:02 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1999
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8i
Document Relationships
1999 NS Housing - Jordan Construction Co and Taylor Home Improvements Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\1990's\1999
Minutes - 19990621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1990's\1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />13 <br />1 t <br />4. Install 3/a CD plywood. Install'/a Juan plywood. Prepare the <br />plywood for vinyl. <br />5. Install cabinets with wood fronts and factory finish. <br />Install same lineal footage as the existing cabinets. Install a <br />Rolled back, formica counter top. <br />DINING ROOM: <br />1. Remove the floor and ceiling covering to the joists. <br />3. Install 1/2 inch CD plywood and 5/8 inch CD plywood on the <br />floor. <br />4. Install lh inch sheetrock on the ceiling. Tape and finish the <br />sheetrock smooth. <br />5. Install colonail style baseboard. <br />HALL: <br />1. Remove the floor and ceiling covering to the joists. <br />2. Install i/s inch CD plywood and S/8 inch plywood on the floor. <br />3. Install'/s inch sheetrock on the ceiling. Tape and finish the <br />sheetrock smooth. <br />4. Install colonial style baseboard. <br />HALL BATH: <br />1. Remove the ceiling texture, the wall covering, and window. <br />2. Install MR sheetrock on the <br />inside of the bath and regular sheetrock on the hall side of the window. <br />Tape and finish the sheetrock smooth. <br />3. Install a tub enclosurer with corner shelves. <br />4. Install a five piece accessory kit, kit to have two towel <br />bars, tumbler holder, paper holder and soap dish. <br />
The URL can be used to link to this page
Your browser does not support the video tag.